COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Tuesday, 13 September 11
CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Monday, 10 October 11
MOZAMBIQUE CHANNEL TO BE THE NEW PIRACY HOTSPOT FOR THIS YEAR SAYS MARITIME SECURITY EXPERT - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The Mozambique Channel, as well as the entrance to the Persian Gulf, are expected to become some of the new pirate hotspots for piracy, says Richard ...


Sunday, 09 October 11
FREIGHT MARKET ENDED WITH A POSITIVE DIRECTION - VISTAAR
COALspot.com - The market ended with a positive note with all the segments up except for handy size. The biggest gainer was Panamax index up by 11 p ...


Saturday, 08 October 11
INDONESIAN MINER PLANS $167M IPO TO FUEL SUMATRA COAL BOOM - JG
The Jakarta Globe reported that, coal miner Atlas Resources aims to raise as much as Rp 1.5 trillion ($167 million) in an initial public offering to ...


Friday, 07 October 11
MINING REGULATIONS , OBSTACLES AND GROWTH : INDIA VS INDONESIA - SUNIL K KUMBHAT
COALspot.com - The Govt of India has passed long pending Mines & Minerals (Regulation and Development) Bill, 2011, which seeks to replace  ...


Friday, 07 October 11
$100M FOR EXPANSION INTO KALIMANTAN MINING: AKR
The Jakarta Globe, one of the leading English news paper in Indonesia reported that, AKR Corporindo, a fuel and chemical distributor, has set aside ...


   1007 1008 1009 1010 1011   
Showing 5041 to 5045 news of total 6871
News by Category
Popular News
 
Total Members : 28,706
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Timah Investasi Mineral - Indoneisa
  • Ministry of Mines - Canada
  • Riau Bara Harum - Indonesia
  • Sarangani Energy Corporation, Philippines
  • PLN - Indonesia
  • Tanito Harum - Indonesia
  • McConnell Dowell - Australia
  • GHCL Limited - India
  • ACC Limited - India
  • Makarim & Taira - Indonesia
  • TGV SRAAC LIMITED, India
  • SRK Consulting
  • Berau Coal - Indonesia
  • Carbofer General Trading SA - India
  • Sree Jayajothi Cements Limited - India
  • Shree Cement - India
  • Inspectorate - India
  • Bhatia International Limited - India
  • Indonesia Power. PT
  • Sucofindo - Indonesia
  • Central Electricity Authority - India
  • Karaikal Port Pvt Ltd - India
  • Antam Resourcindo - Indonesia
  • Economic Council, Georgia
  • Toyota Tsusho Corporation, Japan
  • Merrill Lynch Commodities Europe
  • KPCL - India
  • Pinang Coal Indonesia
  • IEA Clean Coal Centre - UK
  • Oldendorff Carriers - Singapore
  • Sojitz Corporation - Japan
  • Japan Coal Energy Center
  • Idemitsu - Japan
  • ANZ Bank - Australia
  • Mitsubishi Corporation
  • Global Business Power Corporation, Philippines
  • Holcim Trading Pte Ltd - Singapore
  • Humpuss - Indonesia
  • Petron Corporation, Philippines
  • Marubeni Corporation - India
  • Malco - India
  • Krishnapatnam Port Company Ltd. - India
  • San Jose City I Power Corp, Philippines
  • Chamber of Mines of South Africa
  • Savvy Resources Ltd - HongKong
  • MS Steel International - UAE
  • Asian Development Bank
  • Samsung - South Korea
  • Panama Canal Authority
  • Thai Mozambique Logistica
  • Indo Tambangraya Megah - Indonesia
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Kobe Steel Ltd - Japan
  • Trasteel International SA, Italy
  • OPG Power Generation Pvt Ltd - India
  • bp singapore
  • Runge Indonesia
  • KEPCO - South Korea
  • Ceylon Electricity Board - Sri Lanka
  • Heidelberg Cement - Germany
  • Coeclerici Indonesia
  • DBS Bank - Singapore
  • Arutmin Indonesia
  • PowerSource Philippines DevCo
  • J M Baxi & Co - India
  • Kideco Jaya Agung - Indonesia
  • Gujarat Mineral Development Corp Ltd - India
  • Peabody Energy - USA
  • Metalloyd Limited - United Kingdom
  • Electricity Generating Authority of Thailand
  • Siam City Cement - Thailand
  • Directorate General of MIneral and Coal - Indonesia
  • Thermax Limited - India
  • BRS Brokers - Singapore
  • Indian Oil Corporation Limited
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Vedanta Resources Plc - India
  • Malabar Cements Ltd - India
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • CCIC - Indonesia
  • Videocon Industries ltd - India
  • Aditya Birla Group - India
  • Cardiff University - UK
  • SUEK AG - Indonesia
  • Gresik Semen - Indonesia
  • Semirara Mining and Power Corporation, Philippines
  • Ministry of Finance - Indonesia
  • ETA - Dubai
  • Deloitte Consulting - India
  • Gupta Coal India Ltd
  • Mitsui
  • Bukit Baiduri Energy - Indonesia
  • Simpson Spence & Young - Indonesia
  • Eastern Energy - Thailand
  • World Bank
  • World Coal - UK
  • Price Waterhouse Coopers - Russia
  • GB Group - China
  • Kapuas Tunggal Persada - Indonesia
  • Ince & co LLP
  • KOWEPO - South Korea
  • Mitra SK Pvt Ltd - India
  • Maheswari Brothers Coal Limited - India
  • Sinarmas Energy and Mining - Indonesia
  • Uttam Galva Steels Limited - India
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Moodys - Singapore
  • Romanian Commodities Exchange
  • Energy Link Ltd, New Zealand
  • Indika Energy - Indonesia
  • Parliament of New Zealand
  • Latin American Coal - Colombia
  • Port Waratah Coal Services - Australia
  • SGS (Thailand) Limited
  • Formosa Plastics Group - Taiwan
  • Salva Resources Pvt Ltd - India
  • PTC India Limited - India
  • Tata Power - India
  • CESC Limited - India
  • BNP Paribas - Singapore
  • Bangkok Bank PCL
  • ING Bank NV - Singapore
  • Madhucon Powers Ltd - India
  • Banpu Public Company Limited - Thailand
  • U S Energy Resources
  • Electricity Authority, New Zealand
  • Ambuja Cements Ltd - India
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • The State Trading Corporation of India Ltd
  • Rio Tinto Coal - Australia
  • Jaiprakash Power Ventures ltd
  • Larsen & Toubro Limited - India
  • Baramulti Group, Indonesia
  • Maruti Cements - India
  • SMG Consultants - Indonesia
  • Straits Asia Resources Limited - Singapore
  • Britmindo - Indonesia
  • ICICI Bank Limited - India
  • Indorama - Singapore
  • Qatrana Cement - Jordan
  • Clarksons - UK
  • IHS Mccloskey Coal Group - USA
  • RBS Sempra - UK
  • Meenaskhi Energy Private Limited - India
  • EIA - United States
  • Bank of China, Malaysia
  • Mintek Dendrill Indonesia
  • Permata Bank - Indonesia
  • CIMB Investment Bank - Malaysia
  • Indian Energy Exchange, India
  • Australian Commodity Traders Exchange
  • Directorate Of Revenue Intelligence - India
  • Cemex - Philippines
  • Bukit Makmur.PT - Indonesia
  • Standard Chartered Bank - UAE
  • Rashtriya Ispat Nigam Limited - India
  • Asmin Koalindo Tuhup - Indonesia
  • GMR Energy Limited - India
  • PLN Batubara - Indonesia
  • PNOC Exploration Corporation - Philippines
  • Thomson Reuters GRC
  • Cosco
  • Coal Orbis AG
  • GN Power Mariveles Coal Plant, Philippines
  • Minerals Council of Australia
  • Maersk Broker
  • Adaro Indonesia
  • Coaltrans Conferences
  • ASAPP Information Group - India
  • Cargill India Pvt Ltd
  • Mechel - Russia
  • Vitol - Bahrain
  • Jatenergy - Australia
  • TNB Fuel Sdn Bhd - Malaysia
  • Sindya Power Generating Company Private Ltd
  • Total Coal South Africa
  • Globalindo Alam Lestari - Indonesia
  • South Luzon Thermal Energy Corporation
  • Xstrata Coal
  • Mercator Lines Limited - India
  • Ernst & Young Pvt. Ltd.
  • Chettinad Cement Corporation Ltd - India
  • Binh Thuan Hamico - Vietnam
  • VISA Power Limited - India
  • Gujarat Electricity Regulatory Commission - India
  • Kalimantan Lumbung Energi - Indonesia
  • Argus Media - Singapore
  • Renaissance Capital - South Africa
  • Anglo American - United Kingdom
  • Orica Australia Pty. Ltd.
  • SASOL - South Africa
  • Kobexindo Tractors - Indoneisa
  • Barclays Capital - USA
  • Geoservices-GeoAssay Lab
  • Thriveni
  • Infraline Energy - India
  • Bulk Trading Sa - Switzerland
  • Arch Coal - USA
  • Petrosea - Indonesia
  • NALCO India
  • Petrochimia International Co. Ltd.- Taiwan
  • Gujarat Sidhee Cement - India
  • Karbindo Abesyapradhi - Indoneisa
  • GVK Power & Infra Limited - India
  • Global Green Power PLC Corporation, Philippines
  • International Coal Ventures Pvt Ltd - India
  • Bukit Asam (Persero) Tbk - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • Billiton Holdings Pty Ltd - Australia
  • Pendopo Energi Batubara - Indonesia
  • Jorong Barutama Greston.PT - Indonesia
  • Asia Cement - Taiwan
  • Cigading International Bulk Terminal - Indonesia
  • Lafarge - France
  • TNPL - India
  • The Treasury - Australian Government
  • Kepco SPC Power Corporation, Philippines
  • Xindia Steels Limited - India
  • TANGEDCO India
  • India Bulls Power Limited - India
  • European Bulk Services B.V. - Netherlands
  • Independent Power Producers Association of India
  • Planning Commission, India
  • Lanco Infratech Ltd - India
  • Essar Steel Hazira Ltd - India
  • The University of Queensland
  • Bangladesh Power Developement Board
  • Shenhua Group - China
  • JPower - Japan
  • IOL Indonesia
  • Iligan Light & Power Inc, Philippines
  • Siam City Cement PLC, Thailand
  • Coal and Oil Company - UAE
  • Goldman Sachs - Singapore
  • Kartika Selabumi Mining - Indonesia
  • Coalindo Energy - Indonesia
  • Edison Trading Spa - Italy
  • APGENCO India
  • PetroVietnam Power Coal Import and Supply Company
  • Commonwealth Bank - Australia
  • Inco-Indonesia
  • The India Cements Ltd
  • Intertek Mineral Services - Indonesia
  • TeaM Sual Corporation - Philippines
  • EMO - The Netherlands
  • Global Coal Blending Company Limited - Australia
  • Wood Mackenzie - Singapore
  • Orica Mining Services - Indonesia
  • Noble Europe Ltd - UK
  • KPMG - USA
  • Altura Mining Limited, Indonesia
  • Enel Italy
  • AsiaOL BioFuels Corp., Philippines
  • Merrill Lynch Bank
  • globalCOAL - UK
  • Platou - Singapore
  • Miang Besar Coal Terminal - Indonesia
  • UBS Singapore
  • Leighton Contractors Pty Ltd - Australia
  • Africa Commodities Group - South Africa
  • Deutsche Bank - India
  • London Commodity Brokers - England
  • CoalTek, United States
  • UOB Asia (HK) Ltd
  • Central Java Power - Indonesia
  • Wilmar Investment Holdings
  • Cement Manufacturers Association - India
  • Credit Suisse - India
  • Adani Power Ltd - India
  • Coastal Gujarat Power Limited - India
  • Maybank - Singapore
  • Attock Cement Pakistan Limited
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Kaltim Prima Coal - Indonesia
  • Ind-Barath Power Infra Limited - India
  • Core Mineral Indonesia
  • CNBM International Corporation - China
  • Kohat Cement Company Ltd. - Pakistan
  • Bayan Resources Tbk. - Indonesia
  • TRAFIGURA, South Korea
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Samtan Co., Ltd - South Korea
  • OCBC - Singapore
  • Indian School of Mines
  • GNFC Limited - India
  • IMC Shipping - Singapore
  • Tata Chemicals Ltd - India
  • Thiess Contractors Indonesia
  • Semirara Mining Corp, Philippines
  • Bhoruka Overseas - Indonesia
  • New Zealand Coal & Carbon
  • Maharashtra Electricity Regulatory Commission - India
  • Grasim Industreis Ltd - India
  • Interocean Group of Companies - India
  • McKinsey & Co - India
  • Bharathi Cement Corporation - India
  • GAC Shipping (India) Pvt Ltd
  • Aboitiz Power Corporation - Philippines
  • SMC Global Power, Philippines
  • JPMorgan - India
  • Pipit Mutiara Jaya. PT, Indonesia
  • Borneo Indobara - Indonesia
  • SN Aboitiz Power Inc, Philippines
  • Rudhra Energy - India
  • Bank of America
  • Power Finance Corporation Ltd., India
  • Platts
  • Cebu Energy, Philippines
  • Meralco Power Generation, Philippines
  • Fearnleys - India
  • Energy Development Corp, Philippines
  • Parry Sugars Refinery, India
  • Russian Coal LLC
  • Ministry of Transport, Egypt
  • Therma Luzon, Inc, Philippines
  • Eastern Coal Council - USA
  • White Energy Company Limited
  • Medco Energi Mining Internasional
  • HSBC - Hong Kong
  • Glencore India Pvt. Ltd
  • Kumho Petrochemical, South Korea
  • Posco Energy - South Korea
  • Dalmia Cement Bharat India
  • Agrawal Coal Company - India
  • Reliance Power - India
  • Singapore Mercantile Exchange
  • Coal India Limited
  • Indonesian Coal Mining Association
  • Tamil Nadu electricity Board
  • PetroVietnam
  • Mercuria Energy - Indonesia
  • Indogreen Group - Indonesia
  • Bahari Cakrawala Sebuku - Indonesia
  • Neyveli Lignite Corporation Ltd, - India
  • Vale Mozambique
  • Star Paper Mills Limited - India
  • Australian Coal Association
  • Georgia Ports Authority, United States
  • Manunggal Multi Energi - Indonesia
  • IBC Asia (S) Pte Ltd
  • Surastha Cement
  • Sakthi Sugars Limited - India
  • Thailand Anthracite
  • Bhushan Steel Limited - India
  • LBH Netherlands Bv - Netherlands
  • Freeport Indonesia
  • Barasentosa Lestari - Indonesia
  • NTPC Limited - India
  • Vizag Seaport Private Limited - India
  • Jindal Steel & Power Ltd - India
  • WorleyParsons
  • Sical Logistics Limited - India
  • Mjunction Services Limited - India
  • Vijayanagar Sugar Pvt Ltd - India
  • MEC Coal - Indonesia