CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Thursday, 06 October 11
REALM SECURES 51% OF KATINGAN RIA COAL PROJECT IN CENTRAL KALIMANTAN
•Realm secures 51% of PT Katingan Ria Thermal Coal Project in Central Kalimantan •Realm takes ownership of Kalres Limited •Acquisit ...


Thursday, 06 October 11
SOUTH EAST ASIAS AGGRESSIVE POWER DEMAND GROWTH WILL REQUIRE INVESTMENT OF US$125 BN BY 2020 - WOOD MACKENZIE
COALspot.com - Wood Mackenzie says that South East Asia’s demand growth for new power generation is so aggressive that new power generation in ...


Thursday, 06 October 11
CHINESE DEMAND FOR COAL IMPORTS TO MODERATE IN 2012 - MISWIN MAHESH
COALspot.com - We expect Chinese demand growth for imported steam coal to moderate over the next year. Steam coal imports into China will modera ...


Wednesday, 05 October 11
MINISTRY STICKING TO RAW COMMODITY EXPORT BAN DESPITE INDUSTRY FEARS - JG
The Jakarta Globe, the one of the leading English news paper in Indonesia, reported that, the details of a controversial new regulation that would b ...


Wednesday, 05 October 11
ATLANTIC AND PACIFIC BASINS BECAME TIGHTER FOR PANAMAX LAST WEEK - BRS
A slump for both the Capes and Panamaxes sent the BDI down 1% this week, falling to 1,899 points. The Capes saw the greatest movement, sliding - ...


   1008 1009 1010 1011 1012   
Showing 5046 to 5050 news of total 6871
News by Category
Popular News
 
Total Members : 28,706
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Chamber of Mines of South Africa
  • Tamil Nadu electricity Board
  • Ind-Barath Power Infra Limited - India
  • Parry Sugars Refinery, India
  • Shenhua Group - China
  • Tata Chemicals Ltd - India
  • Central Java Power - Indonesia
  • Indorama - Singapore
  • Mercuria Energy - Indonesia
  • PLN Batubara - Indonesia
  • Total Coal South Africa
  • Agrawal Coal Company - India
  • Kumho Petrochemical, South Korea
  • Kapuas Tunggal Persada - Indonesia
  • Simpson Spence & Young - Indonesia
  • PTC India Limited - India
  • Arutmin Indonesia
  • Coalindo Energy - Indonesia
  • Asmin Koalindo Tuhup - Indonesia
  • Geoservices-GeoAssay Lab
  • Peabody Energy - USA
  • VISA Power Limited - India
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Electricity Authority, New Zealand
  • Aditya Birla Group - India
  • Semirara Mining Corp, Philippines
  • Malco - India
  • Bhoruka Overseas - Indonesia
  • J M Baxi & Co - India
  • Directorate Of Revenue Intelligence - India
  • Attock Cement Pakistan Limited
  • TNPL - India
  • Freeport Indonesia
  • Samsung - South Korea
  • Borneo Indobara - Indonesia
  • Bhushan Steel Limited - India
  • GVK Power & Infra Limited - India
  • Mintek Dendrill Indonesia
  • Deloitte Consulting - India
  • Tata Power - India
  • Savvy Resources Ltd - HongKong
  • Aboitiz Power Corporation - Philippines
  • Permata Bank - Indonesia
  • AsiaOL BioFuels Corp., Philippines
  • MEC Coal - Indonesia
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Clarksons - UK
  • Global Green Power PLC Corporation, Philippines
  • Sree Jayajothi Cements Limited - India
  • Malabar Cements Ltd - India
  • OPG Power Generation Pvt Ltd - India
  • NTPC Limited - India
  • Grasim Industreis Ltd - India
  • Xindia Steels Limited - India
  • Indian Energy Exchange, India
  • Chettinad Cement Corporation Ltd - India
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • APGENCO India
  • Power Finance Corporation Ltd., India
  • Reliance Power - India
  • ACC Limited - India
  • Moodys - Singapore
  • Surastha Cement
  • Cement Manufacturers Association - India
  • Russian Coal LLC
  • SRK Consulting
  • Medco Energi Mining Internasional
  • Minerals Council of Australia
  • Port Waratah Coal Services - Australia
  • U S Energy Resources
  • PetroVietnam Power Coal Import and Supply Company
  • Gujarat Mineral Development Corp Ltd - India
  • GMR Energy Limited - India
  • Trasteel International SA, Italy
  • Wilmar Investment Holdings
  • Thiess Contractors Indonesia
  • South Luzon Thermal Energy Corporation
  • RBS Sempra - UK
  • Electricity Generating Authority of Thailand
  • Indian Oil Corporation Limited
  • The State Trading Corporation of India Ltd
  • Pendopo Energi Batubara - Indonesia
  • Credit Suisse - India
  • JPower - Japan
  • IMC Shipping - Singapore
  • Alfred C Toepfer International GmbH - Germany
  • Enel Italy
  • Coal India Limited
  • Meenaskhi Energy Private Limited - India
  • London Commodity Brokers - England
  • JPMorgan - India
  • Uttam Galva Steels Limited - India
  • Krishnapatnam Port Company Ltd. - India
  • Platts
  • TRAFIGURA, South Korea
  • Star Paper Mills Limited - India
  • BNP Paribas - Singapore
  • Energy Link Ltd, New Zealand
  • Global Coal Blending Company Limited - Australia
  • Petrosea - Indonesia
  • bp singapore
  • Karaikal Port Pvt Ltd - India
  • KOWEPO - South Korea
  • Bangkok Bank PCL
  • Edison Trading Spa - Italy
  • Economic Council, Georgia
  • Altura Mining Limited, Indonesia
  • Lafarge - France
  • Maersk Broker
  • Sucofindo - Indonesia
  • Therma Luzon, Inc, Philippines
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • TeaM Sual Corporation - Philippines
  • Bayan Resources Tbk. - Indonesia
  • Price Waterhouse Coopers - Russia
  • Australian Commodity Traders Exchange
  • Cargill India Pvt Ltd
  • Siam City Cement - Thailand
  • Runge Indonesia
  • Formosa Plastics Group - Taiwan
  • World Coal - UK
  • LBH Netherlands Bv - Netherlands
  • Coaltrans Conferences
  • Rudhra Energy - India
  • Riau Bara Harum - Indonesia
  • Mjunction Services Limited - India
  • Wood Mackenzie - Singapore
  • Billiton Holdings Pty Ltd - Australia
  • PetroVietnam
  • Karbindo Abesyapradhi - Indoneisa
  • Indian School of Mines
  • Petron Corporation, Philippines
  • Gupta Coal India Ltd
  • ASAPP Information Group - India
  • Holcim Trading Pte Ltd - Singapore
  • Neyveli Lignite Corporation Ltd, - India
  • Bahari Cakrawala Sebuku - Indonesia
  • Cosco
  • Fearnleys - India
  • GAC Shipping (India) Pvt Ltd
  • Inco-Indonesia
  • Mitsubishi Corporation
  • Energy Development Corp, Philippines
  • Indonesian Coal Mining Association
  • Ministry of Mines - Canada
  • Anglo American - United Kingdom
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Orica Mining Services - Indonesia
  • Cardiff University - UK
  • Tanito Harum - Indonesia
  • OCBC - Singapore
  • Timah Investasi Mineral - Indoneisa
  • Bank of America
  • Kideco Jaya Agung - Indonesia
  • Thai Mozambique Logistica
  • Gujarat Electricity Regulatory Commission - India
  • Antam Resourcindo - Indonesia
  • Africa Commodities Group - South Africa
  • Japan Coal Energy Center
  • IHS Mccloskey Coal Group - USA
  • Vitol - Bahrain
  • Maruti Cements - India
  • Thomson Reuters GRC
  • The India Cements Ltd
  • Sarangani Energy Corporation, Philippines
  • Rashtriya Ispat Nigam Limited - India
  • TNB Fuel Sdn Bhd - Malaysia
  • Toyota Tsusho Corporation, Japan
  • Jorong Barutama Greston.PT - Indonesia
  • Rio Tinto Coal - Australia
  • Jatenergy - Australia
  • Thailand Anthracite
  • Glencore India Pvt. Ltd
  • Kepco SPC Power Corporation, Philippines
  • McConnell Dowell - Australia
  • Mercator Lines Limited - India
  • ETA - Dubai
  • The Treasury - Australian Government
  • Ministry of Finance - Indonesia
  • Britmindo - Indonesia
  • Australian Coal Association
  • KEPCO - South Korea
  • Meralco Power Generation, Philippines
  • Asia Cement - Taiwan
  • Sakthi Sugars Limited - India
  • Merrill Lynch Commodities Europe
  • Petrochimia International Co. Ltd.- Taiwan
  • Sindya Power Generating Company Private Ltd
  • Eastern Coal Council - USA
  • Iligan Light & Power Inc, Philippines
  • Heidelberg Cement - Germany
  • Sojitz Corporation - Japan
  • Ernst & Young Pvt. Ltd.
  • Argus Media - Singapore
  • EIA - United States
  • Latin American Coal - Colombia
  • Mitra SK Pvt Ltd - India
  • Commonwealth Bank - Australia
  • PNOC Exploration Corporation - Philippines
  • Ceylon Electricity Board - Sri Lanka
  • Bank of China, Malaysia
  • Deutsche Bank - India
  • Bharathi Cement Corporation - India
  • Kalimantan Lumbung Energi - Indonesia
  • Standard Chartered Bank - UAE
  • Global Business Power Corporation, Philippines
  • UBS Singapore
  • Posco Energy - South Korea
  • International Coal Ventures Pvt Ltd - India
  • Samtan Co., Ltd - South Korea
  • MS Steel International - UAE
  • Gujarat Sidhee Cement - India
  • Romanian Commodities Exchange
  • HSBC - Hong Kong
  • Thriveni
  • Salva Resources Pvt Ltd - India
  • Straits Asia Resources Limited - Singapore
  • CESC Limited - India
  • Ince & co LLP
  • Barasentosa Lestari - Indonesia
  • BRS Brokers - Singapore
  • Miang Besar Coal Terminal - Indonesia
  • Parliament of New Zealand
  • Thermax Limited - India
  • Indika Energy - Indonesia
  • Planning Commission, India
  • Bukit Makmur.PT - Indonesia
  • Leighton Contractors Pty Ltd - Australia
  • DBS Bank - Singapore
  • SUEK AG - Indonesia
  • CCIC - Indonesia
  • Gresik Semen - Indonesia
  • Qatrana Cement - Jordan
  • India Bulls Power Limited - India
  • KPMG - USA
  • Mechel - Russia
  • EMO - The Netherlands
  • PowerSource Philippines DevCo
  • Panama Canal Authority
  • Core Mineral Indonesia
  • Xstrata Coal
  • Oldendorff Carriers - Singapore
  • Marubeni Corporation - India
  • Madhucon Powers Ltd - India
  • Arch Coal - USA
  • Ministry of Transport, Egypt
  • IBC Asia (S) Pte Ltd
  • Vizag Seaport Private Limited - India
  • Orica Australia Pty. Ltd.
  • European Bulk Services B.V. - Netherlands
  • GNFC Limited - India
  • Larsen & Toubro Limited - India
  • Interocean Group of Companies - India
  • Coeclerici Indonesia
  • KPCL - India
  • Berau Coal - Indonesia
  • Vale Mozambique
  • Bukit Baiduri Energy - Indonesia
  • Lanco Infratech Ltd - India
  • SASOL - South Africa
  • Inspectorate - India
  • SMG Consultants - Indonesia
  • Vedanta Resources Plc - India
  • Cebu Energy, Philippines
  • GN Power Mariveles Coal Plant, Philippines
  • Mitsui
  • NALCO India
  • GB Group - China
  • Dalmia Cement Bharat India
  • Kobe Steel Ltd - Japan
  • Idemitsu - Japan
  • Sinarmas Energy and Mining - Indonesia
  • Coal and Oil Company - UAE
  • SMC Global Power, Philippines
  • Maheswari Brothers Coal Limited - India
  • Bhatia International Limited - India
  • ICICI Bank Limited - India
  • Kobexindo Tractors - Indoneisa
  • Renaissance Capital - South Africa
  • McKinsey & Co - India
  • Noble Europe Ltd - UK
  • Coal Orbis AG
  • Globalindo Alam Lestari - Indonesia
  • Cemex - Philippines
  • White Energy Company Limited
  • Ambuja Cements Ltd - India
  • Sical Logistics Limited - India
  • Platou - Singapore
  • Binh Thuan Hamico - Vietnam
  • Siam City Cement PLC, Thailand
  • Asian Development Bank
  • UOB Asia (HK) Ltd
  • Indo Tambangraya Megah - Indonesia
  • Bulk Trading Sa - Switzerland
  • Pinang Coal Indonesia
  • SGS (Thailand) Limited
  • Semirara Mining and Power Corporation, Philippines
  • CNBM International Corporation - China
  • Baramulti Group, Indonesia
  • IEA Clean Coal Centre - UK
  • ING Bank NV - Singapore
  • TANGEDCO India
  • Central Electricity Authority - India
  • Independent Power Producers Association of India
  • GHCL Limited - India
  • Videocon Industries ltd - India
  • Directorate General of MIneral and Coal - Indonesia
  • Goldman Sachs - Singapore
  • Georgia Ports Authority, United States
  • Barclays Capital - USA
  • Bangladesh Power Developement Board
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Infraline Energy - India
  • SN Aboitiz Power Inc, Philippines
  • Pipit Mutiara Jaya. PT, Indonesia
  • Essar Steel Hazira Ltd - India
  • PLN - Indonesia
  • San Jose City I Power Corp, Philippines
  • Singapore Mercantile Exchange
  • Makarim & Taira - Indonesia
  • Cigading International Bulk Terminal - Indonesia
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Humpuss - Indonesia
  • Merrill Lynch Bank
  • Vijayanagar Sugar Pvt Ltd - India
  • New Zealand Coal & Carbon
  • World Bank
  • Kohat Cement Company Ltd. - Pakistan
  • Adani Power Ltd - India
  • Maybank - Singapore
  • Bukit Asam (Persero) Tbk - Indonesia
  • globalCOAL - UK
  • Manunggal Multi Energi - Indonesia
  • CoalTek, United States
  • Jaiprakash Power Ventures ltd
  • Kaltim Prima Coal - Indonesia
  • Intertek Mineral Services - Indonesia
  • CIMB Investment Bank - Malaysia
  • Metalloyd Limited - United Kingdom
  • ANZ Bank - Australia
  • Carbofer General Trading SA - India
  • Banpu Public Company Limited - Thailand
  • Shree Cement - India
  • Adaro Indonesia
  • TGV SRAAC LIMITED, India
  • Maharashtra Electricity Regulatory Commission - India
  • Kartika Selabumi Mining - Indonesia
  • The University of Queensland
  • Indogreen Group - Indonesia
  • Jindal Steel & Power Ltd - India
  • Eastern Energy - Thailand
  • IOL Indonesia
  • WorleyParsons
  • Coastal Gujarat Power Limited - India
  • Indonesia Power. PT