CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Tuesday, 22 November 11
NTPC TO BUY 2 MMT OF IMPORTED COAL FOR ITS FOUR PLANTS
COALspot.com - NTPC Limited, incorporated in 1975 as a public sector company wholly owned by Government of India, the largest thermal power generati ...
Tuesday, 22 November 11
ABM INVESTAMA SETS IPO AT RP 3,750
Insider Stories reported that, Integrated energy company PT ABM Investama Tbk has determined the IPO price at Rp3,750 (approximately US$ 0.415) per ...
Tuesday, 22 November 11
A SURPRISINGLY STRONG WEEK FOR THE CAPES - BRS
Positive gains for most of the segments this week, the exception being the Handysizes. Overall the BDI ended the week at 1,895 points (+3.3% week-on ...
Tuesday, 22 November 11
APPETITE FOR DRY BULK VESSELS SLOWS DOWN AT THE START OF THE WEEK - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The dry bulk market was down at the beginning of the week, as demand for Capesize vessels was particularly low. The industry’s benchmark, the ...
Monday, 21 November 11
CAPESIZES DRIVE MARKET LOWER, ANALYSTS DIVIDED ON DRY BULK OUTLOOK IN THE LONG RUN - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The dry bulk market ended the week on a sour note, with the industry’s benchmark heading downwards to 1,895 points, which represented a slight ...
|
|
|
Showing 4966 to 4970 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Aboitiz Power Corporation - Philippines
- Energy Development Corp, Philippines
- New Zealand Coal & Carbon
- Eastern Energy - Thailand
- Central Electricity Authority - India
- Indo Tambangraya Megah - Indonesia
- Vijayanagar Sugar Pvt Ltd - India
- Altura Mining Limited, Indonesia
- Dalmia Cement Bharat India
- Coastal Gujarat Power Limited - India
- Georgia Ports Authority, United States
- South Luzon Thermal Energy Corporation
- Aditya Birla Group - India
- Siam City Cement - Thailand
- Larsen & Toubro Limited - India
- Gujarat Electricity Regulatory Commission - India
- LBH Netherlands Bv - Netherlands
- Maheswari Brothers Coal Limited - India
- Lanco Infratech Ltd - India
- Kideco Jaya Agung - Indonesia
- Bulk Trading Sa - Switzerland
- Asia Pacific Energy Resources Ventures Inc, Philippines
- Directorate Of Revenue Intelligence - India
- Wood Mackenzie - Singapore
- Banpu Public Company Limited - Thailand
- Minerals Council of Australia
- Electricity Authority, New Zealand
- Malabar Cements Ltd - India
- Chamber of Mines of South Africa
- Price Waterhouse Coopers - Russia
- Leighton Contractors Pty Ltd - Australia
- Orica Mining Services - Indonesia
- Bharathi Cement Corporation - India
- Coalindo Energy - Indonesia
- Indika Energy - Indonesia
- Sojitz Corporation - Japan
- Medco Energi Mining Internasional
- Ambuja Cements Ltd - India
- Ministry of Mines - Canada
- Parry Sugars Refinery, India
- Salva Resources Pvt Ltd - India
- The University of Queensland
- Gujarat Mineral Development Corp Ltd - India
- ICICI Bank Limited - India
- SN Aboitiz Power Inc, Philippines
- Gujarat Sidhee Cement - India
- Antam Resourcindo - Indonesia
- Goldman Sachs - Singapore
- Eastern Coal Council - USA
- Meenaskhi Energy Private Limited - India
- PetroVietnam Power Coal Import and Supply Company
- TeaM Sual Corporation - Philippines
- Globalindo Alam Lestari - Indonesia
- Heidelberg Cement - Germany
- Bhatia International Limited - India
- Tata Chemicals Ltd - India
- Maharashtra Electricity Regulatory Commission - India
- Standard Chartered Bank - UAE
- Thiess Contractors Indonesia
- Kobexindo Tractors - Indoneisa
- GN Power Mariveles Coal Plant, Philippines
- Cement Manufacturers Association - India
- SMC Global Power, Philippines
- Indian Energy Exchange, India
- Cigading International Bulk Terminal - Indonesia
- Riau Bara Harum - Indonesia
- Semirara Mining Corp, Philippines
- Mjunction Services Limited - India
- Mercator Lines Limited - India
- Renaissance Capital - South Africa
- GMR Energy Limited - India
- Formosa Plastics Group - Taiwan
- Central Java Power - Indonesia
- Bukit Baiduri Energy - Indonesia
- GVK Power & Infra Limited - India
- Bahari Cakrawala Sebuku - Indonesia
- Planning Commission, India
- Sakthi Sugars Limited - India
- Karbindo Abesyapradhi - Indoneisa
- Mintek Dendrill Indonesia
- Semirara Mining and Power Corporation, Philippines
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Global Green Power PLC Corporation, Philippines
- Marubeni Corporation - India
- Alfred C Toepfer International GmbH - Germany
- Rashtriya Ispat Nigam Limited - India
- Trasteel International SA, Italy
- Energy Link Ltd, New Zealand
- Deloitte Consulting - India
- Videocon Industries ltd - India
- Sarangani Energy Corporation, Philippines
- Timah Investasi Mineral - Indoneisa
- Economic Council, Georgia
- Bayan Resources Tbk. - Indonesia
- GAC Shipping (India) Pvt Ltd
- Parliament of New Zealand
- Kumho Petrochemical, South Korea
- TNB Fuel Sdn Bhd - Malaysia
- Edison Trading Spa - Italy
- London Commodity Brokers - England
- Simpson Spence & Young - Indonesia
- Chettinad Cement Corporation Ltd - India
- Madhucon Powers Ltd - India
- Borneo Indobara - Indonesia
- Kalimantan Lumbung Energi - Indonesia
- Ministry of Finance - Indonesia
- European Bulk Services B.V. - Netherlands
- Offshore Bulk Terminal Pte Ltd, Singapore
- Rio Tinto Coal - Australia
- Holcim Trading Pte Ltd - Singapore
- Bukit Asam (Persero) Tbk - Indonesia
- Metalloyd Limited - United Kingdom
- Sinarmas Energy and Mining - Indonesia
- SMG Consultants - Indonesia
- Coal and Oil Company - UAE
- Billiton Holdings Pty Ltd - Australia
- Ceylon Electricity Board - Sri Lanka
- Carbofer General Trading SA - India
- Independent Power Producers Association of India
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Barasentosa Lestari - Indonesia
- PTC India Limited - India
- Grasim Industreis Ltd - India
- Pendopo Energi Batubara - Indonesia
- Sindya Power Generating Company Private Ltd
- Uttam Galva Steels Limited - India
- IEA Clean Coal Centre - UK
- MS Steel International - UAE
- The State Trading Corporation of India Ltd
- San Jose City I Power Corp, Philippines
- Therma Luzon, Inc, Philippines
- International Coal Ventures Pvt Ltd - India
- Global Coal Blending Company Limited - Australia
- Africa Commodities Group - South Africa
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Wilmar Investment Holdings
- Global Business Power Corporation, Philippines
- Commonwealth Bank - Australia
- Essar Steel Hazira Ltd - India
- Kapuas Tunggal Persada - Indonesia
- Siam City Cement PLC, Thailand
- Manunggal Multi Energi - Indonesia
- Samtan Co., Ltd - South Korea
- Karaikal Port Pvt Ltd - India
- OPG Power Generation Pvt Ltd - India
- Kohat Cement Company Ltd. - Pakistan
- Bank of Tokyo Mitsubishi UFJ Ltd
- Petrochimia International Co. Ltd.- Taiwan
- VISA Power Limited - India
- Neyveli Lignite Corporation Ltd, - India
- ASAPP Information Group - India
- Ministry of Transport, Egypt
- Makarim & Taira - Indonesia
- India Bulls Power Limited - India
- Tamil Nadu electricity Board
- Binh Thuan Hamico - Vietnam
- Star Paper Mills Limited - India
- Port Waratah Coal Services - Australia
- Bhoruka Overseas - Indonesia
- Meralco Power Generation, Philippines
- Orica Australia Pty. Ltd.
- The Treasury - Australian Government
- Bangladesh Power Developement Board
- Bukit Makmur.PT - Indonesia
- PowerSource Philippines DevCo
- Pipit Mutiara Jaya. PT, Indonesia
- Singapore Mercantile Exchange
- Indonesian Coal Mining Association
- Interocean Group of Companies - India
- Straits Asia Resources Limited - Singapore
- PNOC Exploration Corporation - Philippines
- White Energy Company Limited
- Agrawal Coal Company - India
- Australian Coal Association
- Xindia Steels Limited - India
- Posco Energy - South Korea
- AsiaOL BioFuels Corp., Philippines
- Thai Mozambique Logistica
- Kaltim Prima Coal - Indonesia
- Bhushan Steel Limited - India
- Jaiprakash Power Ventures ltd
- Vedanta Resources Plc - India
- Latin American Coal - Colombia
- Oldendorff Carriers - Singapore
- Australian Commodity Traders Exchange
- Romanian Commodities Exchange
- Sree Jayajothi Cements Limited - India
- Jindal Steel & Power Ltd - India
- Indogreen Group - Indonesia
- Kartika Selabumi Mining - Indonesia
- CNBM International Corporation - China
- Petron Corporation, Philippines
- Indian Oil Corporation Limited
- Directorate General of MIneral and Coal - Indonesia
- Anglo American - United Kingdom
- Power Finance Corporation Ltd., India
- Jorong Barutama Greston.PT - Indonesia
- Electricity Generating Authority of Thailand
- Ind-Barath Power Infra Limited - India
- Intertek Mineral Services - Indonesia
- Kepco SPC Power Corporation, Philippines
- Sical Logistics Limited - India
- Krishnapatnam Port Company Ltd. - India
- Toyota Tsusho Corporation, Japan
- CIMB Investment Bank - Malaysia
- Miang Besar Coal Terminal - Indonesia
- Savvy Resources Ltd - HongKong
- Attock Cement Pakistan Limited
- IHS Mccloskey Coal Group - USA
- Mercuria Energy - Indonesia
- Vizag Seaport Private Limited - India
- Merrill Lynch Commodities Europe
- Asmin Koalindo Tuhup - Indonesia
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Baramulti Group, Indonesia
- Iligan Light & Power Inc, Philippines
- McConnell Dowell - Australia
|
| |
| |
|