COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Tuesday, 13 September 11
CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Saturday, 26 November 11
THE FREIGHT MARKETS EXPECTED TO BE STEADY NEXT WEEK - VISTAAR
COALspot.com - The market were down probably with the sentiments of global financial markets and all segments were down. The BDI was up down by 4 ...


Friday, 25 November 11
DISPUTE BETWEEN GIANT MINING FIRMS ENDS IN LAHAT - THE JAKARTA POST
The Jakarta Post reported that, prolonged dispute taking place in the South Sumatra regency of Lahat and involving two giant mining companies PT Buk ...


Friday, 25 November 11
DRY BULK MARKET LOSING STEAM, FAST - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
It’s been a week of falls for the dry bulk market this one, leaving ship owners with a sour taste in their mouths, as evidence of a recovery i ...


Thursday, 24 November 11
INDONESIA/INDIA SPMX TC AROUND $ 7/8K AND AROUND $ 12/13.00 PMTS ON VOYAGE BASIS - FEARNLEYS
Handy Last week ended on a positive note in the Atlantic however the activity levels are somewhat reduced.  Owners are asking in excess of USD ...


Thursday, 24 November 11
DRY BULK MARKET KEEPS LOSING STEAM - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The dry bulk market was lower once again on Wednesday, with the industry’s benchmark, the Baltic Dry Index (BDI) ending the session down by 1. ...


   991 992 993 994 995   
Showing 4961 to 4965 news of total 6871
News by Category
Popular News
 
Total Members : 28,706
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • San Jose City I Power Corp, Philippines
  • PowerSource Philippines DevCo
  • Bahari Cakrawala Sebuku - Indonesia
  • NALCO India
  • Indonesia Power. PT
  • Globalindo Alam Lestari - Indonesia
  • Reliance Power - India
  • Electricity Generating Authority of Thailand
  • SASOL - South Africa
  • Core Mineral Indonesia
  • Deloitte Consulting - India
  • OCBC - Singapore
  • Miang Besar Coal Terminal - Indonesia
  • Sojitz Corporation - Japan
  • SGS (Thailand) Limited
  • Pinang Coal Indonesia
  • Samtan Co., Ltd - South Korea
  • LBH Netherlands Bv - Netherlands
  • Star Paper Mills Limited - India
  • Bhatia International Limited - India
  • Latin American Coal - Colombia
  • JPMorgan - India
  • Vedanta Resources Plc - India
  • Arch Coal - USA
  • Bank of America
  • Bank of China, Malaysia
  • Indian Energy Exchange, India
  • Mitra SK Pvt Ltd - India
  • Samsung - South Korea
  • TeaM Sual Corporation - Philippines
  • Inco-Indonesia
  • Permata Bank - Indonesia
  • Heidelberg Cement - Germany
  • Adaro Indonesia
  • Credit Suisse - India
  • J M Baxi & Co - India
  • Cigading International Bulk Terminal - Indonesia
  • Wilmar Investment Holdings
  • Sinarmas Energy and Mining - Indonesia
  • Mercator Lines Limited - India
  • Timah Investasi Mineral - Indoneisa
  • ANZ Bank - Australia
  • Bhushan Steel Limited - India
  • Price Waterhouse Coopers - Russia
  • Shree Cement - India
  • Georgia Ports Authority, United States
  • The State Trading Corporation of India Ltd
  • PetroVietnam
  • Bayan Resources Tbk. - Indonesia
  • Central Electricity Authority - India
  • Global Business Power Corporation, Philippines
  • Krishnapatnam Port Company Ltd. - India
  • Aboitiz Power Corporation - Philippines
  • Leighton Contractors Pty Ltd - Australia
  • CIMB Investment Bank - Malaysia
  • Chamber of Mines of South Africa
  • Moodys - Singapore
  • bp singapore
  • Eastern Coal Council - USA
  • Infraline Energy - India
  • Interocean Group of Companies - India
  • Karaikal Port Pvt Ltd - India
  • Kumho Petrochemical, South Korea
  • Ind-Barath Power Infra Limited - India
  • Energy Development Corp, Philippines
  • NTPC Limited - India
  • Vitol - Bahrain
  • Cebu Energy, Philippines
  • Antam Resourcindo - Indonesia
  • Ernst & Young Pvt. Ltd.
  • Grasim Industreis Ltd - India
  • Goldman Sachs - Singapore
  • Thomson Reuters GRC
  • Jaiprakash Power Ventures ltd
  • Agrawal Coal Company - India
  • IMC Shipping - Singapore
  • EMO - The Netherlands
  • Lanco Infratech Ltd - India
  • Malco - India
  • Baramulti Group, Indonesia
  • Indogreen Group - Indonesia
  • Kobe Steel Ltd - Japan
  • Geoservices-GeoAssay Lab
  • Cardiff University - UK
  • Maybank - Singapore
  • McConnell Dowell - Australia
  • Romanian Commodities Exchange
  • Borneo Indobara - Indonesia
  • KOWEPO - South Korea
  • Sindya Power Generating Company Private Ltd
  • India Bulls Power Limited - India
  • Glencore India Pvt. Ltd
  • Kobexindo Tractors - Indoneisa
  • globalCOAL - UK
  • Karbindo Abesyapradhi - Indoneisa
  • Standard Chartered Bank - UAE
  • South Luzon Thermal Energy Corporation
  • UOB Asia (HK) Ltd
  • ACC Limited - India
  • Commonwealth Bank - Australia
  • Enel Italy
  • Gujarat Mineral Development Corp Ltd - India
  • Essar Steel Hazira Ltd - India
  • GN Power Mariveles Coal Plant, Philippines
  • Asmin Koalindo Tuhup - Indonesia
  • Thiess Contractors Indonesia
  • UBS Singapore
  • Arutmin Indonesia
  • Rio Tinto Coal - Australia
  • Carbofer General Trading SA - India
  • CNBM International Corporation - China
  • Freeport Indonesia
  • Semirara Mining and Power Corporation, Philippines
  • Central Java Power - Indonesia
  • Xstrata Coal
  • BRS Brokers - Singapore
  • Fearnleys - India
  • SMC Global Power, Philippines
  • Coal Orbis AG
  • Holcim Trading Pte Ltd - Singapore
  • Merrill Lynch Bank
  • TGV SRAAC LIMITED, India
  • Clarksons - UK
  • Thermax Limited - India
  • Siam City Cement - Thailand
  • Global Green Power PLC Corporation, Philippines
  • Toyota Tsusho Corporation, Japan
  • Sical Logistics Limited - India
  • ICICI Bank Limited - India
  • Bukit Makmur.PT - Indonesia
  • ING Bank NV - Singapore
  • Barclays Capital - USA
  • Shenhua Group - China
  • Savvy Resources Ltd - HongKong
  • Ince & co LLP
  • IEA Clean Coal Centre - UK
  • Sakthi Sugars Limited - India
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • Bangkok Bank PCL
  • Global Coal Blending Company Limited - Australia
  • Billiton Holdings Pty Ltd - Australia
  • Kalimantan Lumbung Energi - Indonesia
  • Qatrana Cement - Jordan
  • Platou - Singapore
  • GMR Energy Limited - India
  • PLN - Indonesia
  • London Commodity Brokers - England
  • Jindal Steel & Power Ltd - India
  • McKinsey & Co - India
  • Dalmia Cement Bharat India
  • Manunggal Multi Energi - Indonesia
  • Kideco Jaya Agung - Indonesia
  • Makarim & Taira - Indonesia
  • Siam City Cement PLC, Thailand
  • PNOC Exploration Corporation - Philippines
  • Petron Corporation, Philippines
  • Chettinad Cement Corporation Ltd - India
  • Indika Energy - Indonesia
  • World Coal - UK
  • Bukit Baiduri Energy - Indonesia
  • CoalTek, United States
  • Coeclerici Indonesia
  • Coal India Limited
  • Anglo American - United Kingdom
  • Binh Thuan Hamico - Vietnam
  • Ceylon Electricity Board - Sri Lanka
  • World Bank
  • Ministry of Finance - Indonesia
  • Rashtriya Ispat Nigam Limited - India
  • Sree Jayajothi Cements Limited - India
  • Independent Power Producers Association of India
  • Kapuas Tunggal Persada - Indonesia
  • Coal and Oil Company - UAE
  • Bharathi Cement Corporation - India
  • Kepco SPC Power Corporation, Philippines
  • Vijayanagar Sugar Pvt Ltd - India
  • International Coal Ventures Pvt Ltd - India
  • Tamil Nadu electricity Board
  • VISA Power Limited - India
  • Gresik Semen - Indonesia
  • Malabar Cements Ltd - India
  • Maruti Cements - India
  • Electricity Authority, New Zealand
  • Sucofindo - Indonesia
  • Peabody Energy - USA
  • MEC Coal - Indonesia
  • Planning Commission, India
  • Platts
  • Attock Cement Pakistan Limited
  • Bulk Trading Sa - Switzerland
  • Japan Coal Energy Center
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Jorong Barutama Greston.PT - Indonesia
  • Directorate General of MIneral and Coal - Indonesia
  • Indonesian Coal Mining Association
  • Straits Asia Resources Limited - Singapore
  • Parry Sugars Refinery, India
  • Renaissance Capital - South Africa
  • Noble Europe Ltd - UK
  • Indo Tambangraya Megah - Indonesia
  • Mechel - Russia
  • Mjunction Services Limited - India
  • Meenaskhi Energy Private Limited - India
  • HSBC - Hong Kong
  • Runge Indonesia
  • Vizag Seaport Private Limited - India
  • JPower - Japan
  • Semirara Mining Corp, Philippines
  • Energy Link Ltd, New Zealand
  • Barasentosa Lestari - Indonesia
  • Riau Bara Harum - Indonesia
  • IBC Asia (S) Pte Ltd
  • TNB Fuel Sdn Bhd - Malaysia
  • Cemex - Philippines
  • White Energy Company Limited
  • KEPCO - South Korea
  • Maersk Broker
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Altura Mining Limited, Indonesia
  • KPMG - USA
  • Africa Commodities Group - South Africa
  • Mitsui
  • Maharashtra Electricity Regulatory Commission - India
  • Surastha Cement
  • Sarangani Energy Corporation, Philippines
  • Posco Energy - South Korea
  • Eastern Energy - Thailand
  • Indian School of Mines
  • SN Aboitiz Power Inc, Philippines
  • Thai Mozambique Logistica
  • KPCL - India
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Wood Mackenzie - Singapore
  • Deutsche Bank - India
  • Mercuria Energy - Indonesia
  • SMG Consultants - Indonesia
  • CESC Limited - India
  • GVK Power & Infra Limited - India
  • APGENCO India
  • Gupta Coal India Ltd
  • Rudhra Energy - India
  • Jatenergy - Australia
  • Russian Coal LLC
  • Directorate Of Revenue Intelligence - India
  • Thriveni
  • Lafarge - France
  • Tata Chemicals Ltd - India
  • AsiaOL BioFuels Corp., Philippines
  • Madhucon Powers Ltd - India
  • TNPL - India
  • Australian Commodity Traders Exchange
  • Larsen & Toubro Limited - India
  • ASAPP Information Group - India
  • Britmindo - Indonesia
  • Kaltim Prima Coal - Indonesia
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Panama Canal Authority
  • GHCL Limited - India
  • Tata Power - India
  • Therma Luzon, Inc, Philippines
  • Simpson Spence & Young - Indonesia
  • Orica Mining Services - Indonesia
  • Australian Coal Association
  • The India Cements Ltd
  • U S Energy Resources
  • Coalindo Energy - Indonesia
  • PLN Batubara - Indonesia
  • Total Coal South Africa
  • Vale Mozambique
  • Salva Resources Pvt Ltd - India
  • Berau Coal - Indonesia
  • The University of Queensland
  • GAC Shipping (India) Pvt Ltd
  • Iligan Light & Power Inc, Philippines
  • Uttam Galva Steels Limited - India
  • SRK Consulting
  • Kohat Cement Company Ltd. - Pakistan
  • Thailand Anthracite
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Adani Power Ltd - India
  • Parliament of New Zealand
  • Kartika Selabumi Mining - Indonesia
  • Oldendorff Carriers - Singapore
  • Bangladesh Power Developement Board
  • Asian Development Bank
  • Orica Australia Pty. Ltd.
  • Mitsubishi Corporation
  • IHS Mccloskey Coal Group - USA
  • Edison Trading Spa - Italy
  • Indian Oil Corporation Limited
  • Petrochimia International Co. Ltd.- Taiwan
  • Indorama - Singapore
  • OPG Power Generation Pvt Ltd - India
  • Cosco
  • Mintek Dendrill Indonesia
  • Maheswari Brothers Coal Limited - India
  • DBS Bank - Singapore
  • Bhoruka Overseas - Indonesia
  • Power Finance Corporation Ltd., India
  • New Zealand Coal & Carbon
  • Humpuss - Indonesia
  • Meralco Power Generation, Philippines
  • Neyveli Lignite Corporation Ltd, - India
  • Bukit Asam (Persero) Tbk - Indonesia
  • RBS Sempra - UK
  • GNFC Limited - India
  • PTC India Limited - India
  • Port Waratah Coal Services - Australia
  • WorleyParsons
  • Argus Media - Singapore
  • Marubeni Corporation - India
  • Xindia Steels Limited - India
  • Intertek Mineral Services - Indonesia
  • SUEK AG - Indonesia
  • Tanito Harum - Indonesia
  • TANGEDCO India
  • Pendopo Energi Batubara - Indonesia
  • Minerals Council of Australia
  • TRAFIGURA, South Korea
  • Cement Manufacturers Association - India
  • Cargill India Pvt Ltd
  • Formosa Plastics Group - Taiwan
  • BNP Paribas - Singapore
  • Gujarat Sidhee Cement - India
  • GB Group - China
  • Petrosea - Indonesia
  • Pipit Mutiara Jaya. PT, Indonesia
  • MS Steel International - UAE
  • EIA - United States
  • European Bulk Services B.V. - Netherlands
  • The Treasury - Australian Government
  • Ambuja Cements Ltd - India
  • Medco Energi Mining Internasional
  • Banpu Public Company Limited - Thailand
  • Alfred C Toepfer International GmbH - Germany
  • Videocon Industries ltd - India
  • Economic Council, Georgia
  • IOL Indonesia
  • Metalloyd Limited - United Kingdom
  • Coastal Gujarat Power Limited - India
  • Ministry of Mines - Canada
  • Ministry of Transport, Egypt
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Singapore Mercantile Exchange
  • Aditya Birla Group - India
  • Inspectorate - India
  • Coaltrans Conferences
  • Idemitsu - Japan
  • Trasteel International SA, Italy
  • Asia Cement - Taiwan
  • Gujarat Electricity Regulatory Commission - India
  • ETA - Dubai
  • PetroVietnam Power Coal Import and Supply Company
  • CCIC - Indonesia
  • Merrill Lynch Commodities Europe