COALspot.com keeps you connected across the coal world

Submit Your Articles
We welcome article submissions from experts in the areas of coal, mining, shipping, etc.

To Submit your article please click here.

International Energy Events


Search News
Latest CoalNews Headlines
Monday, 30 March 20
LAY-UP AND RE-ACTIVATION REVISITED - GARD
GARDKNOWLEDGE TO ELEVATE

The COVID-19 pandemic has affected the maritime industry in previously unthinkable ways. Ports around the world are denying entry to certain vessels, travel restrictions have postponed crew changes, ships are taken out of service and crew have been laid off. These operational problems are forcing some owners and operators to consider placing vessels in lay-up.
 
Owner’s decision
Once a vessel owner has decided to lay up a vessel, several important decisions must be made. The most important decision is the duration of the lay-up, which will be critical for the type of lay-up selected. If the owner expects to be able to re-employ the vessel in the next twelve months, a hot (or warm) lay-up will be appropriate, with minimum crew on board to keep the machinery and equipment in operational running condition. If the lay-up is planned to last longer than a year, the owner will probably choose to go for a cold lay-up, which will reduce the daily running costs to the actual lay-up fee and watchkeeping.
 
Another important decision is where to lay up the vessel. Owners should obtain approval from local authorities, including information on worst-case weather conditions.
 
Risks related to lay-up
The fact that a vessel has been laid up does not eliminate the risk that a claim may be made by the assured against the insurer during the period the vessel is laid up. The risk after lay-up will depend on a number of factors.
 
Lay-up has two phases – the lay-up itself and the reactivation, including the trading period immediately after breaking lay-up. Each phase has a different risk profile.
 
During lay-up the following risk scenarios can arise:
 
• Risk of being struck by another vessel. Even if the laid-up vessel is without blame, the possibility of the other vessel limiting liability may result in significant unrecoverable costs.
• Risk of breaking moorings. Dragging of the anchor is the most frequent cause of grounding, and having vessels anchored close to the shoreline increases this risk.
• Fire onboard. Vessels laid up in groups next to each other (platooning), can result in cumulative damage. A fire on board one vessel is dangerous but if moored next to other vessels it may spread to these also.
• Low security. Limited manning on board a laid-up and anchored vessel will make it more difficult to cope with emergency situations.
 
During reactivation or immediately after breaking lay-up the following may arise:
 
• Failures due to general deterioration of equipment. The atmosphere and especially the humidity may not have been monitored during lay-up, resulting in corrosion and deterioration.
• Failures due to corrosion inside piping systems and valves (hydraulic, pneumatic systems).
• Heavy machinery components sit statically in the same position or are turned with insufficient lubrication film.
• Starting up problems with malfunctioning regulators and control equipment.
• Failures because components have not been cleaned or opened up after months without operation.
• Electronic equipment start-up failures after months with no power and no software updates.
 
As far as insurance is concerned, lay-up constitutes an alteration of risk, since the vessel is taken out of the normal trade and the operation for which it was designed and equipped. Therefore, the owner (the assured) must inform his insurers that the vessel is taken out of service.
 
Impact on insurance
This first notice to the insurers will normally be followed by a request for a lay-up return of a portion of the premium, as a properly laid-up vessel may represent a reduced risk to insurers. Insurers will usually request additional information and evidence of safe lay-up, as the full risk picture can only be ascertained if there is total transparency between the parties.
 
It is a condition for P&I and hull and machinery insurances that the vessel maintains its Classification, either “in operation” or “laid up” status. A suspension of Class for any reason will automatically lead to a loss of insurance, and the insurance will not be reinstated without written confirmation from Class.
 
The impact of lay-up on the P&I cover is relatively easy to identify as the cargo, passengers and parts of the crew risks are removed or altered. The obvious remaining P&I risks will be possible pollution from leakages (fuel, lube, garbage, etc.) and in worst case a wreck removal if a vessel should break moorings and end up on a beach. Gard’s P&I Rules contain relevant provisions related to survey (Rule 9) and returns of premium (Rule 22). A distinct subjectivity to pro rata reduction of premiums is a minimum of 30 days in lay-up.
 
The impact on the hull and machinery cover is more complex, as the risk profile changes. The Nordic Marine Insurance Plan defines lay-up as an alteration of risk (§3-26) and requires that a lay-up plan is drawn up and submitted to the hull and machinery insurer for approval.
 
Upon receipt of a notice of lay-up Gard will request the following:
 
• Confirmation from owners that the vessel’s Class will be maintained.
• The lay-up plan.
 
The lay-up plan
The lay-up plan shall include requirements from Classification societies and describe how the vessel is laid-up and how it will be preserved and maintained during lay-up. The lay-up plan should also describe the reactivation procedures as foreseen, but obviously these must be modified according to the length of the lay-up.
 
Most Classification societies and a number of marine consulting companies have issued guidelines and recommendations on lay-up of vessels. Classification societies may in addition offer technical services such as lay-up surveys and issue lay-up declarations on how the vessel is laid-up and preserved. These are additional services offered by most Classification societies’ consultancy services which the vessel owners have to pay for. These surveys and declarations are highly recommended, as they usually cover in detail all of Gard’s requirements for documentation of a lay-up for both hull and machinery and P&I covers.
 
Many vessel owners prefer to use their own resources to plan the lay-up and prepare the lay-up plan according to their experience and in-depth knowledge of their vessel. To assist vessel owners, Gard has specified some minimum requirements that should be included in the lay-up plan.
 
The main three requirements which vessel owners must comply with, are:
 
1. The lay-up site must be described with particular attention to the weather conditions and must be approved by the local authorities.
2. The mooring and anchoring arrangements must be approved by or through the vessel’s Classification society. A competent body may perform the calculations, but the approval should go through the Classification society.
3. The vessel owner should contact the manufacturers of the critical equipment on board and make sure maintenance, preservation and reactivation are done according to their recommendations. Preserving expensive accommodation areas on cruise vessels is also important.
 
There are other requirements, such as prevention of and protection from fire and flooding, but the three main requirements listed above ensure that the vessel is laid-up in a sufficiently safe area, the moorings are adequate for the site and expected weather conditions, and the vessel and its equipment are taken care of according to the manufacturers’ recommendations.
 
Reactivation after lay-up
It is not during the lay-up itself that incidents leading to insurance claims usually happen. The most problematic of the different processes involved in a lay-up, and the easiest to overlook or postpone with a view to cutting costs, is the reactivation. This process can take longer than preparing the vessel for lay-up, and the resources necessary not only from the shore management and crew, but also from external service engineers and shipyards with dry-docks, will be demanding. These services can be in high demand during an economic recovery, which normally is the moment vessel owners want the vessels back in service.
 
Gard strongly recommends reactivation after long periods in lay-up to be carried out with utmost care and in accordance with Class and equipment manufacturers’ recommendations. Not only should the machinery itself be carefully handled, but attention must be paid to the fuel and lube oil quality, including analysis if these have been stored on board during the lay-up.
 
When the vessel is reactivated, Class must perform any outstanding surveys together with a full check of the entire machinery installation. Depending on the duration of the lay-up, dry-docking, or at least a sea trial, must be performed. Normally a full Safety Management System audit must also be carried out. The scope of the required surveys will depend to a certain degree on the preservation and maintenance carried out before and during the lay-up. It is therefore very important that these measures are documented during the lay-up. In the event of an insurance claim at a later stage, such documentation will be important to demonstrate that the necessary precautions were taken in accordance with manufacturers’ recommendations.
 
Underwriters may include specific reactivation clauses as part of the cover during lay-up. The main requirement is, again, the involvement of Class and manufacturers, but a separate “additional machinery deductible” may be introduced for a limited time after breaking lay-up to cover the additional risks.
 
Recommendations
It is recommended that the assured notify the insurers early in the planning of an upcoming lay-up period for a vessel. Based on the information provided, the insurers will determine if the idle period will be considered a lay-up and to further consider if they will require a third-party review of the lay-up plan and arrangements.
 
Furthermore, the insurers should be advised as early as possible when a decision is made to reactivate the vessel, in order for the insurers to review to what extent a reactivation survey should be carried out and to allow for the involvement of the surveyor at an early stage of the reactivation and re-commissioning planning.
 
Minimum requirements to be included in a lay-up plan
 
1. Lay-up site
A description of the lay-up site must be provided with a particular focus on the local weather conditions. The lay-up site must also be approved by the local authorities. Lay-up in hurricane-affected and/or tropical areas must be the subject of particular considerations.
 
2. Mooring/anchoring arrangements
Description and maintenance routines of anchoring and mooring arrangements must be provided including distances to shore and to other vessels. The arrangements should preferably be approved by the vessel’s Classification society or by a consultant appointed by them, but other competent bodies may also be used.
 
Information on seabed, maximum wind forces and direction, shore and on-board bollards, anchors with systems is needed for calculation purposes. The anchor windlasses and mooring winches which are in use or under constant tension must be the subject of frequent testing and maintenance to ensure that they function properly at all times.
 
3. Class status
Gard generally requires that the Class is changed into the status of “laid-up” to facilitate a return of premium. Annual and other mandatory surveys must be carried out in accordance with Class rules. As for vessels in normal trading it is a pre-requisite for cover that the Class rules and regulations are followed at all times also during the lay-up, and any suspension of Class will lead to termination of the insurance cover.
 
4. Minimum manning
The flag state’s requirement as to minimum number of crew for the different lay-up situations must be maintained. If watchmen and routine maintenance as described in the lay-up plan are contracted out to third parties, these arrangements must also be described in the lay-up plan.
 
5. Power availability
The lay-up plan should also include the envisaged need for propulsion power and describe the availability of tug assistance in the lay-up area.
 
6. Protection against explosions and fire
All cargo tanks, pump rooms, cofferdams and cargo lines must, as a general rule, be kept gas-free during lay-up. Inerted tanks may be acceptable if approved by local authorities. Hot work is only permitted if a valid gas-free certificate is kept on board.
 
All fire alarm systems must be fully operational during lay-up. The vessel’s normal fire-fighting systems must be available and ready for use. If fixed fire-fighting systems (CO2 tanks) are disconnected for any reason, substitute systems must be operational and approved by Class.
 
7. Precautions against flooding
All sea overboard valves not in use must be closed. If seawater coolers/condensers etc., are left open, the seawater connections must be blanked off.
 
The water level in the ballast tanks, pump room and bilges must be checked regularly and bilge alarm systems for all spaces must be maintained in normal operation. Temporary bilge alarm systems for cold lay-up conditions are acceptable. All watertight doors and manholes must be closed.
 
8. Maintenance of equipment
The lay-up plan must also include specific items in accordance with the manufacturers’ recommendations as to the preservation, maintenance and operation of machinery and other equipment to prevent damage occurring as a result of the items not being in normal use. The plan should describe the preservation and maintenance of among others:
 
• Main engine with turbocharger, gear and shafting arrangement
• Auxiliary engines with generators
• Boilers
• Rotating equipment such as pumps, compressors etc.
• Vessel type specific equipment
• General requirements as to ambient temperature and humidity, use of heaters, dehumidifiers, preservation oil, etc.
 
9. Resuming of trading/breaking of lay-up
The extent of survey and testing when breaking lay-up will depend on the extent of maintenance and other preservative measures which had been undertaken during the lay-up and the reason for breaking lay-up (trading, dry-dock for re-commissioning, scrap). Gard’s requirement is that Class’ requirements for re-commissioning are followed, and that the manufacturers’ recommendations for preservation and maintenance have been followed during the lay-up and re-commissioning.
Source: Gard


If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Thursday, 20 February 20
CHINA RESUMES OVER 70 PCT COAL PRODUCTION CAPACITY AMID EPIDEMIC - XINHUA
China has resumed 70.2 percent of its coal production capacity with output recovering steadily amid the fight against the novel coronavirus epidemi ...


Thursday, 20 February 20
CHINA THERMAL COAL MARKET FACES 2-3 MONTH CORONAVIRUS SHORT SQUEEZE: NOBLE - REUTERS
China’s domestic thermal coal market faces a 2-3 month short squeeze as a rapidly spreading coronavirus outbreak curtails production more tha ...


Wednesday, 19 February 20
KOREA MIDLAND POWER INVITED BIDS FOR 1 MILLION TONS OF HCV AND LCV COAL FOR Q2- Q4 LOADING
COALspot.com: Korea Midland Power Co. Ltd, (KOMIPO). has issued an international tender for total 1 million MT of coal for April to December 2020 l ...


Wednesday, 19 February 20
GLENCORE WRITES OFF ALMOST $1 BILLION AT COLOMBIAN COAL MINES DUE TO FALLING EUROPEAN IMPORTS: BLOOMBERG
The economic case against European coal is proving too much for even Glencore Plc.   The world’s biggest coal shipper cut the va ...


Wednesday, 19 February 20
MINERS WELCOME INDONESIA'S NEW JOBS BILL THAT COULD SPUR COAL GROWTH - REUTERS
Miners have welcomed proposed changes to Indonesian mining rules under a new law aimed at boosting investment, though critics are concerned that th ...


   222 223 224 225 226   
Showing 1116 to 1120 news of total 6871
News by Category
Popular News
 
Total Members : 28,619
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • Singapore Mercantile Exchange
  • Arch Coal - USA
  • SN Aboitiz Power Inc, Philippines
  • Port Waratah Coal Services - Australia
  • Billiton Holdings Pty Ltd - Australia
  • PowerSource Philippines DevCo
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Inspectorate - India
  • KEPCO - South Korea
  • Bhoruka Overseas - Indonesia
  • GB Group - China
  • CIMB Investment Bank - Malaysia
  • Jindal Steel & Power Ltd - India
  • Bukit Asam (Persero) Tbk - Indonesia
  • J M Baxi & Co - India
  • Merrill Lynch Commodities Europe
  • Ceylon Electricity Board - Sri Lanka
  • Pendopo Energi Batubara - Indonesia
  • Manunggal Multi Energi - Indonesia
  • Vitol - Bahrain
  • Kapuas Tunggal Persada - Indonesia
  • Salva Resources Pvt Ltd - India
  • Shree Cement - India
  • Indonesia Power. PT
  • Inco-Indonesia
  • Indo Tambangraya Megah - Indonesia
  • Maheswari Brothers Coal Limited - India
  • Makarim & Taira - Indonesia
  • HSBC - Hong Kong
  • CoalTek, United States
  • Interocean Group of Companies - India
  • Orica Australia Pty. Ltd.
  • Moodys - Singapore
  • Standard Chartered Bank - UAE
  • Kideco Jaya Agung - Indonesia
  • Panama Canal Authority
  • KOWEPO - South Korea
  • Indian Energy Exchange, India
  • Cargill India Pvt Ltd
  • ETA - Dubai
  • India Bulls Power Limited - India
  • Bhushan Steel Limited - India
  • bp singapore
  • Peabody Energy - USA
  • Aboitiz Power Corporation - Philippines
  • NTPC Limited - India
  • South Luzon Thermal Energy Corporation
  • EMO - The Netherlands
  • Global Business Power Corporation, Philippines
  • Maruti Cements - India
  • SASOL - South Africa
  • Jaiprakash Power Ventures ltd
  • Uttam Galva Steels Limited - India
  • Baramulti Group, Indonesia
  • Total Coal South Africa
  • Minerals Council of Australia
  • MEC Coal - Indonesia
  • Mitsui
  • Asmin Koalindo Tuhup - Indonesia
  • Chamber of Mines of South Africa
  • Bank of America
  • Rashtriya Ispat Nigam Limited - India
  • Attock Cement Pakistan Limited
  • Antam Resourcindo - Indonesia
  • Globalindo Alam Lestari - Indonesia
  • Bahari Cakrawala Sebuku - Indonesia
  • Borneo Indobara - Indonesia
  • Sakthi Sugars Limited - India
  • TRAFIGURA, South Korea
  • IBC Asia (S) Pte Ltd
  • Parry Sugars Refinery, India
  • Sucofindo - Indonesia
  • Parliament of New Zealand
  • ASAPP Information Group - India
  • Platts
  • TNB Fuel Sdn Bhd - Malaysia
  • globalCOAL - UK
  • European Bulk Services B.V. - Netherlands
  • KPCL - India
  • SUEK AG - Indonesia
  • IEA Clean Coal Centre - UK
  • Savvy Resources Ltd - HongKong
  • Malabar Cements Ltd - India
  • Adani Power Ltd - India
  • World Bank
  • Iligan Light & Power Inc, Philippines
  • TeaM Sual Corporation - Philippines
  • Vizag Seaport Private Limited - India
  • WorleyParsons
  • Indonesian Coal Mining Association
  • GMR Energy Limited - India
  • Medco Energi Mining Internasional
  • Carbofer General Trading SA - India
  • PTC India Limited - India
  • GHCL Limited - India
  • Sree Jayajothi Cements Limited - India
  • Commonwealth Bank - Australia
  • SMC Global Power, Philippines
  • Price Waterhouse Coopers - Russia
  • GN Power Mariveles Coal Plant, Philippines
  • Sindya Power Generating Company Private Ltd
  • Asian Development Bank
  • IHS Mccloskey Coal Group - USA
  • JPower - Japan
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • PetroVietnam
  • Ministry of Mines - Canada
  • SRK Consulting
  • Therma Luzon, Inc, Philippines
  • Power Finance Corporation Ltd., India
  • Humpuss - Indonesia
  • Cosco
  • Shenhua Group - China
  • Deutsche Bank - India
  • Geoservices-GeoAssay Lab
  • CNBM International Corporation - China
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • BRS Brokers - Singapore
  • Merrill Lynch Bank
  • Renaissance Capital - South Africa
  • MS Steel International - UAE
  • NALCO India
  • Larsen & Toubro Limited - India
  • Australian Commodity Traders Exchange
  • Sical Logistics Limited - India
  • Bank of China, Malaysia
  • Goldman Sachs - Singapore
  • Cebu Energy, Philippines
  • TNPL - India
  • Intertek Mineral Services - Indonesia
  • Aditya Birla Group - India
  • Coal India Limited
  • Permata Bank - Indonesia
  • Global Green Power PLC Corporation, Philippines
  • Mjunction Services Limited - India
  • Central Java Power - Indonesia
  • Petrochimia International Co. Ltd.- Taiwan
  • Cardiff University - UK
  • Bukit Baiduri Energy - Indonesia
  • Gujarat Sidhee Cement - India
  • Riau Bara Harum - Indonesia
  • Bhatia International Limited - India
  • Sojitz Corporation - Japan
  • Lafarge - France
  • Formosa Plastics Group - Taiwan
  • Bayan Resources Tbk. - Indonesia
  • Tamil Nadu electricity Board
  • Jorong Barutama Greston.PT - Indonesia
  • Ambuja Cements Ltd - India
  • APGENCO India
  • Adaro Indonesia
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • Indorama - Singapore
  • Directorate Of Revenue Intelligence - India
  • Kobexindo Tractors - Indoneisa
  • Reliance Power - India
  • Asia Cement - Taiwan
  • Romanian Commodities Exchange
  • Coalindo Energy - Indonesia
  • Metalloyd Limited - United Kingdom
  • London Commodity Brokers - England
  • Holcim Trading Pte Ltd - Singapore
  • AsiaOL BioFuels Corp., Philippines
  • Pipit Mutiara Jaya. PT, Indonesia
  • Wilmar Investment Holdings
  • OCBC - Singapore
  • Gujarat Electricity Regulatory Commission - India
  • GAC Shipping (India) Pvt Ltd
  • Electricity Authority, New Zealand
  • Ministry of Transport, Egypt
  • Rudhra Energy - India
  • Star Paper Mills Limited - India
  • Japan Coal Energy Center
  • Idemitsu - Japan
  • TANGEDCO India
  • Coal and Oil Company - UAE
  • Coeclerici Indonesia
  • CCIC - Indonesia
  • Tanito Harum - Indonesia
  • Credit Suisse - India
  • Kohat Cement Company Ltd. - Pakistan
  • Maersk Broker
  • ANZ Bank - Australia
  • Argus Media - Singapore
  • JPMorgan - India
  • OPG Power Generation Pvt Ltd - India
  • Mintek Dendrill Indonesia
  • DBS Bank - Singapore
  • Runge Indonesia
  • RBS Sempra - UK
  • Videocon Industries ltd - India
  • Eastern Energy - Thailand
  • Kepco SPC Power Corporation, Philippines
  • Vale Mozambique
  • Sinarmas Energy and Mining - Indonesia
  • BNP Paribas - Singapore
  • Energy Development Corp, Philippines
  • Simpson Spence & Young - Indonesia
  • Economic Council, Georgia
  • McConnell Dowell - Australia
  • Miang Besar Coal Terminal - Indonesia
  • Gresik Semen - Indonesia
  • PLN Batubara - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • Platou - Singapore
  • Essar Steel Hazira Ltd - India
  • ACC Limited - India
  • The University of Queensland
  • New Zealand Coal & Carbon
  • Wood Mackenzie - Singapore
  • Arutmin Indonesia
  • Timah Investasi Mineral - Indoneisa
  • Deloitte Consulting - India
  • Berau Coal - Indonesia
  • Qatrana Cement - Jordan
  • PetroVietnam Power Coal Import and Supply Company
  • Jatenergy - Australia
  • Indika Energy - Indonesia
  • Africa Commodities Group - South Africa
  • Surastha Cement
  • SMG Consultants - Indonesia
  • Kaltim Prima Coal - Indonesia
  • Vedanta Resources Plc - India
  • GNFC Limited - India
  • Bharathi Cement Corporation - India
  • Trasteel International SA, Italy
  • Mercuria Energy - Indonesia
  • Global Coal Blending Company Limited - Australia
  • Samtan Co., Ltd - South Korea
  • Dalmia Cement Bharat India
  • IOL Indonesia
  • Meralco Power Generation, Philippines
  • Britmindo - Indonesia
  • Vijayanagar Sugar Pvt Ltd - India
  • Gujarat Mineral Development Corp Ltd - India
  • Karaikal Port Pvt Ltd - India
  • Thomson Reuters GRC
  • Latin American Coal - Colombia
  • GVK Power & Infra Limited - India
  • KPMG - USA
  • Mercator Lines Limited - India
  • Fearnleys - India
  • Orica Mining Services - Indonesia
  • Bangkok Bank PCL
  • Bulk Trading Sa - Switzerland
  • Krishnapatnam Port Company Ltd. - India
  • U S Energy Resources
  • Coastal Gujarat Power Limited - India
  • Bukit Makmur.PT - Indonesia
  • Kumho Petrochemical, South Korea
  • Mitsubishi Corporation
  • Pinang Coal Indonesia
  • Clarksons - UK
  • Planning Commission, India
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Indian School of Mines
  • Neyveli Lignite Corporation Ltd, - India
  • International Coal Ventures Pvt Ltd - India
  • Altura Mining Limited, Indonesia
  • Ministry of Finance - Indonesia
  • Thailand Anthracite
  • Australian Coal Association
  • Freeport Indonesia
  • Siam City Cement - Thailand
  • Coal Orbis AG
  • Tata Power - India
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Mitra SK Pvt Ltd - India
  • Georgia Ports Authority, United States
  • Bangladesh Power Developement Board
  • Electricity Generating Authority of Thailand
  • Malco - India
  • Thai Mozambique Logistica
  • VISA Power Limited - India
  • EIA - United States
  • Chettinad Cement Corporation Ltd - India
  • Noble Europe Ltd - UK
  • Oldendorff Carriers - Singapore
  • Ince & co LLP
  • Petrosea - Indonesia
  • Maharashtra Electricity Regulatory Commission - India
  • The India Cements Ltd
  • Semirara Mining and Power Corporation, Philippines
  • Barasentosa Lestari - Indonesia
  • Directorate General of MIneral and Coal - Indonesia
  • Xindia Steels Limited - India
  • Energy Link Ltd, New Zealand
  • Indogreen Group - Indonesia
  • Heidelberg Cement - Germany
  • Xstrata Coal
  • Madhucon Powers Ltd - India
  • Coaltrans Conferences
  • Infraline Energy - India
  • Siam City Cement PLC, Thailand
  • Agrawal Coal Company - India
  • UOB Asia (HK) Ltd
  • Maybank - Singapore
  • Semirara Mining Corp, Philippines
  • Barclays Capital - USA
  • Sarangani Energy Corporation, Philippines
  • Ernst & Young Pvt. Ltd.
  • Kobe Steel Ltd - Japan
  • The Treasury - Australian Government
  • World Coal - UK
  • Cement Manufacturers Association - India
  • Thiess Contractors Indonesia
  • Kartika Selabumi Mining - Indonesia
  • McKinsey & Co - India
  • Banpu Public Company Limited - Thailand
  • Thermax Limited - India
  • Cigading International Bulk Terminal - Indonesia
  • TGV SRAAC LIMITED, India
  • Leighton Contractors Pty Ltd - Australia
  • Edison Trading Spa - Italy
  • Binh Thuan Hamico - Vietnam
  • Core Mineral Indonesia
  • Eastern Coal Council - USA
  • UBS Singapore
  • Mechel - Russia
  • Toyota Tsusho Corporation, Japan
  • Indian Oil Corporation Limited
  • Lanco Infratech Ltd - India
  • Meenaskhi Energy Private Limited - India
  • The State Trading Corporation of India Ltd
  • Straits Asia Resources Limited - Singapore
  • SGS (Thailand) Limited
  • San Jose City I Power Corp, Philippines
  • PLN - Indonesia
  • Rio Tinto Coal - Australia
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Posco Energy - South Korea
  • Tata Chemicals Ltd - India
  • Grasim Industreis Ltd - India
  • ING Bank NV - Singapore
  • Independent Power Producers Association of India
  • Marubeni Corporation - India
  • Thriveni
  • IMC Shipping - Singapore
  • Cemex - Philippines
  • PNOC Exploration Corporation - Philippines
  • Karbindo Abesyapradhi - Indoneisa
  • Gupta Coal India Ltd
  • Kalimantan Lumbung Energi - Indonesia
  • Glencore India Pvt. Ltd
  • CESC Limited - India
  • LBH Netherlands Bv - Netherlands
  • Samsung - South Korea
  • Enel Italy
  • Anglo American - United Kingdom
  • Petron Corporation, Philippines
  • Ind-Barath Power Infra Limited - India
  • Russian Coal LLC
  • Central Electricity Authority - India
  • White Energy Company Limited
  • ICICI Bank Limited - India