CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Thursday, 15 December 11
DRY BULK RATES TO REMAIN AT CURRENT LEVELS FOR THE MOST PART IN THE COMING MONTHS SAYS BIMCO - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
In its latest research note, BIMCO said that the Capesize Time Charter Average will remain at USD 20,000-30,000 per day but the tonnage oversupply w ...
Wednesday, 14 December 11
MINER TOBA BARA SEJAHTRA PLANS IPO IN 1ST HALF OF 2012 - THE JAKARTA GLOBE
The Jakarta Globe reported that, Coal miner Toba Bara Sejahtra is aiming high next year, hoping to capitalize on renewed bullish sentiment in the lo ...
Wednesday, 14 December 11
TIMAH PLANS TO BOOST ITS COAL PRODUCTION TO TWO MILLION TONS PER ANNUM - SOURCES
COALspot.com - Timah plans to boost its coal production to two million tons per annum. The company also expects to acquire coal concession with mini ...
Wednesday, 14 December 11
BORNEO RESOURCE INVESTMENTS LTD. FINALIZES ACQUISITION OF INTEGRA PRIMA
COALspot.com - Borneo Resource Investments Ltd., announced that it has finalized the acquisition of an additional 1,300 hectare coal mining concessi ...
Tuesday, 13 December 11
BERAU COAL SCOUTS US$1.61 BIO SALES - INSIDER STORIES
Insider Stories reported that, coal mining company PT Berau Coal Energy Tbk (BRAU), that is 85% owned by London-listed company Bumi Plc, estimates a ...
|
|
|
Showing 4931 to 4935 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Siam City Cement - Thailand
- Bukit Makmur.PT - Indonesia
- Parry Sugars Refinery, India
- Maheswari Brothers Coal Limited - India
- Ceylon Electricity Board - Sri Lanka
- Merrill Lynch Commodities Europe
- Pipit Mutiara Jaya. PT, Indonesia
- Indonesian Coal Mining Association
- Heidelberg Cement - Germany
- Videocon Industries ltd - India
- Metalloyd Limited - United Kingdom
- Orica Australia Pty. Ltd.
- PNOC Exploration Corporation - Philippines
- The Treasury - Australian Government
- Straits Asia Resources Limited - Singapore
- Asia Pacific Energy Resources Ventures Inc, Philippines
- European Bulk Services B.V. - Netherlands
- Petrochimia International Co. Ltd.- Taiwan
- Trasteel International SA, Italy
- Malabar Cements Ltd - India
- Star Paper Mills Limited - India
- Asmin Koalindo Tuhup - Indonesia
- Wilmar Investment Holdings
- Latin American Coal - Colombia
- Edison Trading Spa - Italy
- Posco Energy - South Korea
- Eastern Energy - Thailand
- SN Aboitiz Power Inc, Philippines
- Romanian Commodities Exchange
- ASAPP Information Group - India
- Gujarat Sidhee Cement - India
- Meralco Power Generation, Philippines
- Anglo American - United Kingdom
- Port Waratah Coal Services - Australia
- OPG Power Generation Pvt Ltd - India
- Kalimantan Lumbung Energi - Indonesia
- MS Steel International - UAE
- Semirara Mining and Power Corporation, Philippines
- Goldman Sachs - Singapore
- Gujarat Electricity Regulatory Commission - India
- Global Business Power Corporation, Philippines
- Power Finance Corporation Ltd., India
- Karaikal Port Pvt Ltd - India
- Directorate Of Revenue Intelligence - India
- Mintek Dendrill Indonesia
- Bhoruka Overseas - Indonesia
- CIMB Investment Bank - Malaysia
- Samtan Co., Ltd - South Korea
- Petron Corporation, Philippines
- Sarangani Energy Corporation, Philippines
- Bayan Resources Tbk. - Indonesia
- Ministry of Transport, Egypt
- Chettinad Cement Corporation Ltd - India
- Oldendorff Carriers - Singapore
- CNBM International Corporation - China
- Medco Energi Mining Internasional
- Globalindo Alam Lestari - Indonesia
- Kideco Jaya Agung - Indonesia
- Electricity Authority, New Zealand
- Binh Thuan Hamico - Vietnam
- Ministry of Mines - Canada
- TeaM Sual Corporation - Philippines
- Bhushan Steel Limited - India
- Energy Development Corp, Philippines
- Kaltim Prima Coal - Indonesia
- Australian Commodity Traders Exchange
- Siam City Cement PLC, Thailand
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- The University of Queensland
- Toyota Tsusho Corporation, Japan
- Essar Steel Hazira Ltd - India
- The State Trading Corporation of India Ltd
- Ind-Barath Power Infra Limited - India
- Bukit Baiduri Energy - Indonesia
- Africa Commodities Group - South Africa
- Neyveli Lignite Corporation Ltd, - India
- White Energy Company Limited
- Parliament of New Zealand
- Central Java Power - Indonesia
- Bank of Tokyo Mitsubishi UFJ Ltd
- Cigading International Bulk Terminal - Indonesia
- Bukit Asam (Persero) Tbk - Indonesia
- Intertek Mineral Services - Indonesia
- Orica Mining Services - Indonesia
- TNB Fuel Sdn Bhd - Malaysia
- Altura Mining Limited, Indonesia
- Coalindo Energy - Indonesia
- Sindya Power Generating Company Private Ltd
- Dalmia Cement Bharat India
- Uttam Galva Steels Limited - India
- Holcim Trading Pte Ltd - Singapore
- Rashtriya Ispat Nigam Limited - India
- Bulk Trading Sa - Switzerland
- Vizag Seaport Private Limited - India
- Therma Luzon, Inc, Philippines
- Pendopo Energi Batubara - Indonesia
- Karbindo Abesyapradhi - Indoneisa
- Semirara Mining Corp, Philippines
- Larsen & Toubro Limited - India
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Price Waterhouse Coopers - Russia
- Lanco Infratech Ltd - India
- Standard Chartered Bank - UAE
- Ambuja Cements Ltd - India
- PetroVietnam Power Coal Import and Supply Company
- Maharashtra Electricity Regulatory Commission - India
- Miang Besar Coal Terminal - Indonesia
- Jindal Steel & Power Ltd - India
- Jorong Barutama Greston.PT - Indonesia
- India Bulls Power Limited - India
- Commonwealth Bank - Australia
- Coastal Gujarat Power Limited - India
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Attock Cement Pakistan Limited
- GVK Power & Infra Limited - India
- Mercator Lines Limited - India
- Kumho Petrochemical, South Korea
- McConnell Dowell - Australia
- Ministry of Finance - Indonesia
- Alfred C Toepfer International GmbH - Germany
- GMR Energy Limited - India
- Bangladesh Power Developement Board
- Australian Coal Association
- Interocean Group of Companies - India
- Meenaskhi Energy Private Limited - India
- Planning Commission, India
- Kobexindo Tractors - Indoneisa
- SMG Consultants - Indonesia
- New Zealand Coal & Carbon
- Simpson Spence & Young - Indonesia
- AsiaOL BioFuels Corp., Philippines
- Thai Mozambique Logistica
- Kartika Selabumi Mining - Indonesia
- Borneo Indobara - Indonesia
- Krishnapatnam Port Company Ltd. - India
- SMC Global Power, Philippines
- Xindia Steels Limited - India
- Leighton Contractors Pty Ltd - Australia
- London Commodity Brokers - England
- Economic Council, Georgia
- Georgia Ports Authority, United States
- South Luzon Thermal Energy Corporation
- Banpu Public Company Limited - Thailand
- San Jose City I Power Corp, Philippines
- PowerSource Philippines DevCo
- Marubeni Corporation - India
- Sakthi Sugars Limited - India
- Savvy Resources Ltd - HongKong
- Global Coal Blending Company Limited - Australia
- Madhucon Powers Ltd - India
- Makarim & Taira - Indonesia
- Jaiprakash Power Ventures ltd
- Deloitte Consulting - India
- IHS Mccloskey Coal Group - USA
- Bahari Cakrawala Sebuku - Indonesia
- Agrawal Coal Company - India
- Cement Manufacturers Association - India
- Bharathi Cement Corporation - India
- Independent Power Producers Association of India
- GN Power Mariveles Coal Plant, Philippines
- Mjunction Services Limited - India
- PTC India Limited - India
- Coal and Oil Company - UAE
- Baramulti Group, Indonesia
- Central Electricity Authority - India
- Indo Tambangraya Megah - Indonesia
- Timah Investasi Mineral - Indoneisa
- VISA Power Limited - India
- Indika Energy - Indonesia
- Offshore Bulk Terminal Pte Ltd, Singapore
- Thiess Contractors Indonesia
- GAC Shipping (India) Pvt Ltd
- Gujarat Mineral Development Corp Ltd - India
- Electricity Generating Authority of Thailand
- Sical Logistics Limited - India
- Iligan Light & Power Inc, Philippines
- Indian Oil Corporation Limited
- Singapore Mercantile Exchange
- LBH Netherlands Bv - Netherlands
- IEA Clean Coal Centre - UK
- Kapuas Tunggal Persada - Indonesia
- Global Green Power PLC Corporation, Philippines
- Eastern Coal Council - USA
- Manunggal Multi Energi - Indonesia
- Tata Chemicals Ltd - India
- Energy Link Ltd, New Zealand
- Sinarmas Energy and Mining - Indonesia
- Grasim Industreis Ltd - India
- Minerals Council of Australia
- Aboitiz Power Corporation - Philippines
- Indogreen Group - Indonesia
- Vedanta Resources Plc - India
- Bhatia International Limited - India
- Directorate General of MIneral and Coal - Indonesia
- Sree Jayajothi Cements Limited - India
- Wood Mackenzie - Singapore
- Formosa Plastics Group - Taiwan
- Billiton Holdings Pty Ltd - Australia
- Renaissance Capital - South Africa
- Mercuria Energy - Indonesia
- Indian Energy Exchange, India
- Riau Bara Harum - Indonesia
- Rio Tinto Coal - Australia
- Aditya Birla Group - India
- Vijayanagar Sugar Pvt Ltd - India
- Salva Resources Pvt Ltd - India
- ICICI Bank Limited - India
- Kepco SPC Power Corporation, Philippines
- Antam Resourcindo - Indonesia
- Carbofer General Trading SA - India
- Kohat Cement Company Ltd. - Pakistan
- Chamber of Mines of South Africa
- Tamil Nadu electricity Board
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Barasentosa Lestari - Indonesia
- Sojitz Corporation - Japan
- International Coal Ventures Pvt Ltd - India
|
| |
| |
|