CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW
By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited
The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.
One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.
Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.
Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.
Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.
Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.
Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.
Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.
For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.
Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.
In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.
Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.
Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.
Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:
 |
As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.
It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.
Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.
The above analysis was originally published on Infraline.
The views and opinions / conclusion expressed on this analysis is purely the writers’ own.
About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).
He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.
If you believe an article violates your rights or the rights of others, please contact us.
|
|
Sunday, 28 August 11
FREIGHT MARKET COULD BE FIRM NEXT MONTH - VISTAAR
COALspot.com - The freight market continued the upward trend first half of the week . However, towards the end of the week lost momentum and the BDI ...
Saturday, 27 August 11
JAPANESE BULK CARRIER SETS RECORD ON NORTHERN SEA ROUTE - BARENTS OBSERVER
The Northern Sea Route will see its third record in less than a month when the largest ever bulk carrier to take the route leaves Murmansk next week ...
Saturday, 27 August 11
RBCT-INDIA ROUNDS FIXED AT AROUND US$ 12K - FEARNBULK
Handy
Stable but very positional markets across all segments in the Atlantic: the gap between owners and charterers rate ideas is building up as o ...
Friday, 26 August 11
TUAH TURANGGA AGUNG ACQUIRES AN ADDITIONAL 40% SHARES IN BARA PRIMA AGUNG
COALspot.com - PT Tuah Turangga Agung, a subsidiary of PT United Tractors Tbk, has signed an acquisition agreement to acquire 40% of PT Bara Prima A ...
Friday, 26 August 11
INTRACO EYES US$200 MIO COAL TAKEOVER - INSIDER STORIES
Heavy equipment distributor PT Intraco Penta Tbk, that was founded by Halex Halim, is scouting a coal acquisition with the valuation above US$200 mi ...
|
|
|
Showing 5111 to 5115 news of total 6871 |
|
 |
|
|
|
|
| |
|
 |
|
|
| |
|
- Chamber of Mines of South Africa
- International Coal Ventures Pvt Ltd - India
- New Zealand Coal & Carbon
- TeaM Sual Corporation - Philippines
- Directorate General of MIneral and Coal - Indonesia
- Salva Resources Pvt Ltd - India
- Wood Mackenzie - Singapore
- GAC Shipping (India) Pvt Ltd
- Bangladesh Power Developement Board
- Bank of Tokyo Mitsubishi UFJ Ltd
- Singapore Mercantile Exchange
- Makarim & Taira - Indonesia
- The Treasury - Australian Government
- Parliament of New Zealand
- Planning Commission, India
- Sree Jayajothi Cements Limited - India
- Attock Cement Pakistan Limited
- Sinarmas Energy and Mining - Indonesia
- Sical Logistics Limited - India
- Coal and Oil Company - UAE
- Asia Pacific Energy Resources Ventures Inc, Philippines
- Holcim Trading Pte Ltd - Singapore
- Independent Power Producers Association of India
- Filglen & Citicon Mining (HK) Ltd - Hong Kong
- Semirara Mining and Power Corporation, Philippines
- Leighton Contractors Pty Ltd - Australia
- Formosa Plastics Group - Taiwan
- Bhushan Steel Limited - India
- Semirara Mining Corp, Philippines
- Siam City Cement PLC, Thailand
- CIMB Investment Bank - Malaysia
- Binh Thuan Hamico - Vietnam
- European Bulk Services B.V. - Netherlands
- Miang Besar Coal Terminal - Indonesia
- Aboitiz Power Corporation - Philippines
- India Bulls Power Limited - India
- Eastern Energy - Thailand
- Baramulti Group, Indonesia
- Goldman Sachs - Singapore
- Siam City Cement - Thailand
- Petrochimia International Co. Ltd.- Taiwan
- Sakthi Sugars Limited - India
- Kumho Petrochemical, South Korea
- Indo Tambangraya Megah - Indonesia
- Metalloyd Limited - United Kingdom
- Rio Tinto Coal - Australia
- Indian Oil Corporation Limited
- GN Power Mariveles Coal Plant, Philippines
- The University of Queensland
- Indogreen Group - Indonesia
- Essar Steel Hazira Ltd - India
- Samtan Co., Ltd - South Korea
- Grasim Industreis Ltd - India
- Commonwealth Bank - Australia
- Tamil Nadu electricity Board
- McConnell Dowell - Australia
- San Jose City I Power Corp, Philippines
- Xindia Steels Limited - India
- Global Green Power PLC Corporation, Philippines
- Antam Resourcindo - Indonesia
- Marubeni Corporation - India
- Gujarat Electricity Regulatory Commission - India
- LBH Netherlands Bv - Netherlands
- Maheswari Brothers Coal Limited - India
- SMC Global Power, Philippines
- Global Business Power Corporation, Philippines
- Kartika Selabumi Mining - Indonesia
- OPG Power Generation Pvt Ltd - India
- Indika Energy - Indonesia
- Merrill Lynch Commodities Europe
- Sindya Power Generating Company Private Ltd
- Ambuja Cements Ltd - India
- Orica Australia Pty. Ltd.
- Dong Bac Coal Mineral Investment Coporation - Vietnam
- Bhatia International Limited - India
- Eastern Coal Council - USA
- Electricity Authority, New Zealand
- Oldendorff Carriers - Singapore
- Thiess Contractors Indonesia
- Vijayanagar Sugar Pvt Ltd - India
- Minerals Council of Australia
- Vedanta Resources Plc - India
- Bukit Makmur.PT - Indonesia
- Rashtriya Ispat Nigam Limited - India
- Orica Mining Services - Indonesia
- Larsen & Toubro Limited - India
- Australian Coal Association
- Kideco Jaya Agung - Indonesia
- Dalmia Cement Bharat India
- Intertek Mineral Services - Indonesia
- ASAPP Information Group - India
- Billiton Holdings Pty Ltd - Australia
- Uttam Galva Steels Limited - India
- Indian Energy Exchange, India
- Directorate Of Revenue Intelligence - India
- Manunggal Multi Energi - Indonesia
- Bharathi Cement Corporation - India
- Borneo Indobara - Indonesia
- Petron Corporation, Philippines
- Central Java Power - Indonesia
- Bhoruka Overseas - Indonesia
- Latin American Coal - Colombia
- Coastal Gujarat Power Limited - India
- GVK Power & Infra Limited - India
- Central Electricity Authority - India
- Coalindo Energy - Indonesia
- Iligan Light & Power Inc, Philippines
- Cigading International Bulk Terminal - Indonesia
- Power Finance Corporation Ltd., India
- CNBM International Corporation - China
- Gujarat Sidhee Cement - India
- Altura Mining Limited, Indonesia
- Meenaskhi Energy Private Limited - India
- Ministry of Finance - Indonesia
- Ind-Barath Power Infra Limited - India
- IEA Clean Coal Centre - UK
- PowerSource Philippines DevCo
- Price Waterhouse Coopers - Russia
- Georgia Ports Authority, United States
- Meralco Power Generation, Philippines
- Interocean Group of Companies - India
- SN Aboitiz Power Inc, Philippines
- Krishnapatnam Port Company Ltd. - India
- Kobexindo Tractors - Indoneisa
- Kaltim Prima Coal - Indonesia
- Malabar Cements Ltd - India
- Africa Commodities Group - South Africa
- SMG Consultants - Indonesia
- Wilmar Investment Holdings
- TNB Fuel Sdn Bhd - Malaysia
- Offshore Bulk Terminal Pte Ltd, Singapore
- Straits Asia Resources Limited - Singapore
- Therma Luzon, Inc, Philippines
- Cement Manufacturers Association - India
- Ministry of Transport, Egypt
- Kalimantan Lumbung Energi - Indonesia
- Truba Alam Manunggal Engineering.Tbk - Indonesia
- Bahari Cakrawala Sebuku - Indonesia
- Lanco Infratech Ltd - India
- Sarangani Energy Corporation, Philippines
- Savvy Resources Ltd - HongKong
- Tata Chemicals Ltd - India
- Mintek Dendrill Indonesia
- Parry Sugars Refinery, India
- Trasteel International SA, Italy
- Videocon Industries ltd - India
- Karaikal Port Pvt Ltd - India
- Gujarat Mineral Development Corp Ltd - India
- Karbindo Abesyapradhi - Indoneisa
- Deloitte Consulting - India
- Heidelberg Cement - Germany
- PetroVietnam Power Coal Import and Supply Company
- Kohat Cement Company Ltd. - Pakistan
- Ministry of Mines - Canada
- PNOC Exploration Corporation - Philippines
- Neyveli Lignite Corporation Ltd, - India
- Star Paper Mills Limited - India
- Chettinad Cement Corporation Ltd - India
- The State Trading Corporation of India Ltd
- Sojitz Corporation - Japan
- Bayan Resources Tbk. - Indonesia
- Madhucon Powers Ltd - India
- MS Steel International - UAE
- Timah Investasi Mineral - Indoneisa
- Electricity Generating Authority of Thailand
- Toyota Tsusho Corporation, Japan
- PTC India Limited - India
- IHS Mccloskey Coal Group - USA
- Anglo American - United Kingdom
- Edison Trading Spa - Italy
- Global Coal Blending Company Limited - Australia
- Energy Development Corp, Philippines
- Jindal Steel & Power Ltd - India
- Pipit Mutiara Jaya. PT, Indonesia
- Carbofer General Trading SA - India
- Riau Bara Harum - Indonesia
- Bukit Asam (Persero) Tbk - Indonesia
- Energy Link Ltd, New Zealand
- Alfred C Toepfer International GmbH - Germany
- Mercuria Energy - Indonesia
- Romanian Commodities Exchange
- London Commodity Brokers - England
- Thai Mozambique Logistica
- Asmin Koalindo Tuhup - Indonesia
- Kapuas Tunggal Persada - Indonesia
- Bukit Baiduri Energy - Indonesia
- Globalindo Alam Lestari - Indonesia
- Jorong Barutama Greston.PT - Indonesia
- Bulk Trading Sa - Switzerland
- Mjunction Services Limited - India
- Aditya Birla Group - India
- White Energy Company Limited
- Posco Energy - South Korea
- Ceylon Electricity Board - Sri Lanka
- Renaissance Capital - South Africa
- ICICI Bank Limited - India
- Dr Ramakrishna Prasad Power Pvt Ltd - India
- Port Waratah Coal Services - Australia
- Barasentosa Lestari - Indonesia
- Medco Energi Mining Internasional
- Mercator Lines Limited - India
- Economic Council, Georgia
- Kepco SPC Power Corporation, Philippines
- Banpu Public Company Limited - Thailand
- South Luzon Thermal Energy Corporation
- GMR Energy Limited - India
- Pendopo Energi Batubara - Indonesia
- Maharashtra Electricity Regulatory Commission - India
- Jaiprakash Power Ventures ltd
- Standard Chartered Bank - UAE
- Simpson Spence & Young - Indonesia
- Indonesian Coal Mining Association
- VISA Power Limited - India
- Vizag Seaport Private Limited - India
- Australian Commodity Traders Exchange
- Agrawal Coal Company - India
- AsiaOL BioFuels Corp., Philippines
|
| |
| |
|