CAPITAL COSTS OF INDIAN COAL MINING PROJECT - AN ANALYST VIEW


By Mr Dipesh Dipu, Director - Consulting (Mining), Deloitte Touche Tohmatsu India Private Limited

The coal mining sector that has been opened partially through captive mining route has seen allocation of 208 coal blocks to private sector, government-owned power generation and other downstream companies. These coal blocks, however, have had limited success in terms of operationalisation on time and at budgeted costs. These have led to serious concerns for coal supplies for power generation sector in India.

One of the key concerns for the development of the coal mines in India has been the quantum of capital required which is the determinant of expected returns from investment perspective and the viability of the project in terms of affordability of power so generated. The capital costs for coal mining projects typically include costs of land, capital equipment and infrastructure to support mining and logistics. Project costs also include capitalised expenses for clearances and approvals that help the mining project take off.

Elements of Capital Costs
Cost of land typically means the cost of acquiring surface rights for coal bearing land for which allocation has been made by the appropriate authority. The recent social concerns that have generated a lot of debate in the country centre on the cost of land which the companies are willing to pay for acquiring surface rights. The recent trends indicate that the land values head northwards since the time of announcement of a project, which makes it challenging to estimate the cost of land. In states that have vast coal resources, the land acquisition issues have been observed to be acute. In Talcher and IB Valley coalfields of Orissa, for example, there are a large number of coal blocks proposed with massive capacities. In these coalfields, it may therefore be expected that land costs will be relatively higher for the coal mining projects. Costs of mining equipment largely dominate the project costs, although due to higher costs of land acquisitions, its proportions are likely to be revised downward. The costs of equipment, typically, are functions of geological characteristics, technology, mine design and requirement of coal processing. Equipment costs also include costs of electricity supply features, drainage systems, environmental management systems, surveillance systems and several others. The costs of construction of coal handling plants and railway siding are parts of support systems for evacuation of coal and if the coal project is relatively farther from the nearest railhead, the costs will be higher. For pit-head power project, the costs include the conveying system from mine to the coal handling system of the power project.

Key Determinants of Capital Costs
Technology is a key determinant of capital cost. Underground coal mining and surface (or opencast) mining has different requirements. In the underground mining methods, there are variants such as bord and pillar, longwall, shortwall and variants for thick seam mining such as horizontal slicing and inclined slicing; sub-level caving and others. The accesses to coal seams are made either through inclines (surface drifts) or vertical shafts, each of which may have substantially different capital cost. In surface mining methods, equipment selection largely determines the project costs - shovel-dumper combinations, dragline, bucket wheel excavators are mostly used in India. The geo-technical parameters like dip and strike length, inclination of seams, thickness of overburden layer, and stripping ratio are indicators of specifications of equipment required, which, in turn, indicate the capital costs.

Equipment selection, therefore, is at the core of the determination of capital costs. In surface mining, the equipment selection takes into account the geological features such as partings between coal seams and expected bench heights. These impact the selection of size of shovels and matching dumper sizes. In such cases, the natural economies of scale need not work and hence, the capital costs per tonne of production versus capacity or size of excavators is a non-linear function.

Apart from the excavators and hauling equipment, capital cost of surface mines also depend on size and number of drilling machines, which, in turn, are dependent on the hardness of the rock. For blasting, the use of site mix slurries or site mix emulsion explosives can eliminate the need to maintain a magazine at mine project and thus, lower the capital costs. Relatively softer rock formation, such as those of lignite, the drilling blasting processes may be replaced by continuous mining system as bucket wheel excavator. Rock fragmentation and the requirement of crushing (including secondary crushing and sizing) will determine the additional equipment required that have a direct bearing on capital costs.

Hydrological characteristics of mine indicate the requirement of drainage and pump capacities. These may be significant where the water tables are high and may have large capital costs required to keep the working faces prevented from being inundated.

Estimates
According to estimates, investments needed in surface coal mining in India are in the range of INR 1500-2100 (approximately US$ 31.65 - 44.30) per tonne of rated capacity. For example, investment in a one million tonne per annum capacity mine is expected to be INR 210 crore (approximately US$ 44.295 million). This estimation is based on a stripping ratio of 4:1 and appropriate adjustments can be made for projects that have higher or lower stripping ratios. This, however, is as good as only an estimate and for the purpose of evaluations and investment decision making purposes, nothing can substitute a detailed plan, including equipment selection and fleet size determination.

For underground mining, the estimates are in the range of INR 1900-2800 (approximately US$ 40.07 - 59.05) per tonne of rated capacity. These are estimated for project that are shallow (within 150 meters depth) and are worked with semi-mechanized bord and pillar mining methods.

Business models change contribution to capital costs
At a high level, project costs remain more or less unchanged, irrespective of ownerships and financing pattern. However, for the project developers, the project costs are not nearly as significant parameters as are the equity investments and returns thereof. The business models now being contemplated and implemented substantially reduces the equity investment and causes the owner of the coal mine to focus on alternative investments such as, those in power generation capacity building. Contract mining is fast catching up in India as the preferred mode for development and operations of mines. The business model of hiring contract mining companies for overburden removal and even mineral winning is not a recent innovation. There are a number of new projects being planned through contract routes. Even the traditional mining companies like, the Coal India Limited and SCCL have been contracting out their mining operations. The scope of work in many cases involves the contract mining company to use their own equipment to carry on mining activities, which reduces the capital expenditure requirement of the coal mine owner.

In a total outsourcing model, the owners contract out all the processes including statutory approvals and clearances, land acquisition, mine development and operations. The recently floated tenders of a few state government owned power utilities are proponents of this model. The prospective bidders for the contract mining projects are expected to conduct their own geo-technical assessments, study the feasibilities and bid for the long term contract. The owner pays for all of these as the coal is mined and delivered to the owner. This model reduces the capital expenditure required by the owner for the coal mine development to nearly negligible.

Other business model is that of equipment leasing, which reduces the initial capital cost substituting the same by a more manageable lease rentals. The finance and operating types of leases help the mining project to have substantially lower cash outflows at the beginning of the project and help match the revenues with the costs when the mine starts the production of coal.

Capital Cost Management
Costs form a part of the decision-making process and cannot be used as a stand-alone decision-making tool. For this reason, there are several frameworks that can be used as a decision-making tool for surface and underground mining projects. These frameworks incorporate thinking obtained from viewing costs as a holistic entity. Strategic Cost Management (SCM) provides the thinking behind viewing costs as a strategic issue. Life Cycle Costing (LCC) suggests making use of the Net Present Value (NPV) approach to account for the use of the capital equipment. The LCC approach incorporates a tool into the framework that ensures that the cost of technology (capital) is accounted for over its lifetime.

Costing is the processing of expenditures to calculate their cost to each project. A typical and an ideal cost management profile is given below:


As costs increase, performance gets impaired. When cost reduction is periodically initiated, it often results in a temporary cull of capabilities, directly impacting on future ability to deliver performance. Where cost reductions are achieved, performance often recovers temporarily, only for focus on proactive cost management to be lost, and for costs to begin to increase again. Without specific cost management action, this cycle can continue indefinitely.

It must be observed that the ability to influence project success and enhance value is greatest at the start of project evaluation and rapidly declines as a project advances towards implementation. In the same instance, the cost of change dramatically increases throughout each project evaluation stage. This suggests that the quality of the decision making in the early stages of project evaluation, primarily focused at capital costs, is critical to an optimal project outcome.

Cost Escalations and Indices
In coal mining projects, capital costs are dynamic and are inflated when the projects get delayed. Cost indexes provide a means of adjusting out-dated capital and operating cost information for the effects of inflation due to such delays. They are based on statistical averages of costs for specific items and time periods. There are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations, which are calculated taking into account several projects done in the past as well as taking economic indices into account. Indexes for specific cost centres, e.g., labour, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available, which are being used by the industry and the regulators to allow prudent escalations in the capital and the operating costs.

The above analysis was originally published on Infraline.

The views and opinions / conclusion expressed on this analysis is purely the writers’ own.

About Dipesh Dipu
Dipesh Dipu works as Director with Deloitte in the Energy and Resources consulting practice of the firm and anchors the Firm’s initiative in the mining and metals sectors. He is a mining engineering graduate from Indian School of Mines and is a Chartered Financial Analyst (CFA).

He has also done executive program in business management from Indian Institute of Management Calcutta. Dipesh has recently been awarded the Abheraj Baldota Gold Medal for the Young Mining Engineer of the Year 2007 by the Mining Engineers’ Association of India in recognition of his contributions in the improvement of mining industry in India.



If you believe an article violates your rights or the rights of others, please contact us.

Recent News

Thursday, 03 November 11
DRY BULK MARKET OFFICIALLY IN THE RED ON LOWER CARGO DEMAND - NIKOS ROUSSANOGLOU, HELLENIC SHIPPING
The dry bulk market kept falling yesterday, on lower iron ore demand, which has caused the industry’s benchmark, the BDI (Baltic Dry Index) to ...


Wednesday, 02 November 11
MMTC TO BUY 3.73 MILLION TONS OF COAL FOR 2011- 2013
COALspot.com - India’s state-owned coal and mineral trader MMTC looking for 3.73 million tons of power plant coal for the period 2011 - 2012/ ...


Wednesday, 02 November 11
PANAMAX MARKET BECAME QUIETER AFTER THE RECENT RECOVERY - BRS
There were substantial losses across the board this week: the BDI lost 6.3% to end at 2,018 and the BCI 8.2% to end 3,274. In the smaller sizes the ...


Tuesday, 01 November 11
BORNEO LUMBUNG BUYS 23.8% INTEREST IN BUMI
COALspot.com - PT. Borneo Lumbung Energi (BORN), an Indonesian coking coal producer announces that it has signed a sale and purchase agreement, cond ...


Tuesday, 01 November 11
BAKRIE FORMS STRATEGIC PARTNERSHIP WITH BORNEO - REDUCING DEBT BY USD 1 BILLION
Press Release - Enhancing the standing of “Indonesia Inc.” at the London Stock Exchange PT Bakrie & Brothers Tbk (“BNBR” ...


   998 999 1000 1001 1002   
Showing 4996 to 5000 news of total 6871
News by Category
Popular News
 
Total Members : 28,706
Member
Panelist
User ID
Password
Remember Me
By logging on you accept our TERMS OF USE.
Free
Register
Forgot Password
 
Our Members Are From ...

  • PTC India Limited - India
  • SMG Consultants - Indonesia
  • JPMorgan - India
  • Kohat Cement Company Ltd. - Pakistan
  • SRK Consulting
  • AsiaOL BioFuels Corp., Philippines
  • Thriveni
  • GMR Energy Limited - India
  • Gresik Semen - Indonesia
  • Samsung - South Korea
  • Britmindo - Indonesia
  • Petron Corporation, Philippines
  • TGV SRAAC LIMITED, India
  • Gupta Coal India Ltd
  • Standard Chartered Bank - UAE
  • CCIC - Indonesia
  • Parliament of New Zealand
  • Agrawal Coal Company - India
  • Australian Commodity Traders Exchange
  • Indian Oil Corporation Limited
  • India Bulls Power Limited - India
  • Australian Coal Association
  • Marubeni Corporation - India
  • Bukit Baiduri Energy - Indonesia
  • Carbofer General Trading SA - India
  • Maersk Broker
  • Manunggal Multi Energi - Indonesia
  • Shenhua Group - China
  • Madhucon Powers Ltd - India
  • Adani Power Ltd - India
  • Bangladesh Power Developement Board
  • GN Power Mariveles Coal Plant, Philippines
  • Moodys - Singapore
  • Enel Italy
  • Uttam Galva Steels Limited - India
  • Trasteel International SA, Italy
  • Ince & co LLP
  • Coal India Limited
  • Gujarat Electricity Regulatory Commission - India
  • UOB Asia (HK) Ltd
  • Karaikal Port Pvt Ltd - India
  • Platts
  • IOL Indonesia
  • Orica Mining Services - Indonesia
  • KPMG - USA
  • Globalindo Alam Lestari - Indonesia
  • Sinarmas Energy and Mining - Indonesia
  • Eastern Coal Council - USA
  • PowerSource Philippines DevCo
  • IHS Mccloskey Coal Group - USA
  • Anglo American - United Kingdom
  • Cigading International Bulk Terminal - Indonesia
  • London Commodity Brokers - England
  • The Treasury - Australian Government
  • Tanito Harum - Indonesia
  • White Energy Company Limited
  • Economic Council, Georgia
  • Adaro Indonesia
  • MEC Coal - Indonesia
  • Dr Ramakrishna Prasad Power Pvt Ltd - India
  • Thomson Reuters GRC
  • Bhoruka Overseas - Indonesia
  • Mintek Dendrill Indonesia
  • European Bulk Services B.V. - Netherlands
  • Mitsubishi Corporation
  • The University of Queensland
  • Wood Mackenzie - Singapore
  • Ambuja Cements Ltd - India
  • Indian School of Mines
  • Humpuss - Indonesia
  • Bayan Resources Tbk. - Indonesia
  • globalCOAL - UK
  • Singapore Mercantile Exchange
  • Interocean Group of Companies - India
  • Therma Luzon, Inc, Philippines
  • Kobe Steel Ltd - Japan
  • Energy Development Corp, Philippines
  • NTPC Limited - India
  • ETA - Dubai
  • Core Mineral Indonesia
  • OCBC - Singapore
  • Inspectorate - India
  • Holcim Trading Pte Ltd - Singapore
  • Gujarat Sidhee Cement - India
  • Peabody Energy - USA
  • Deutsche Bank - India
  • Russian Coal LLC
  • Minerals Council of Australia
  • Coastal Gujarat Power Limited - India
  • Formosa Plastics Group - Taiwan
  • Reliance Power - India
  • Edison Trading Spa - Italy
  • Videocon Industries ltd - India
  • TeaM Sual Corporation - Philippines
  • Geoservices-GeoAssay Lab
  • Iligan Light & Power Inc, Philippines
  • Parry Sugars Refinery, India
  • Coaltrans Conferences
  • Power Finance Corporation Ltd., India
  • Orica Australia Pty. Ltd.
  • Fearnleys - India
  • Global Coal Blending Company Limited - Australia
  • Vedanta Resources Plc - India
  • BNP Paribas - Singapore
  • Indonesian Coal Mining Association
  • Thai Mozambique Logistica
  • Bharathi Cement Corporation - India
  • McKinsey & Co - India
  • Coal Orbis AG
  • Permata Bank - Indonesia
  • Kaltim Prima Coal - Indonesia
  • Africa Commodities Group - South Africa
  • Bangkok Bank PCL
  • Merrill Lynch Bank
  • GHCL Limited - India
  • Renaissance Capital - South Africa
  • Global Green Power PLC Corporation, Philippines
  • Bhushan Steel Limited - India
  • TNB Fuel Sdn Bhd - Malaysia
  • APGENCO India
  • Asian Development Bank
  • Jindal Steel & Power Ltd - India
  • Cebu Energy, Philippines
  • Deloitte Consulting - India
  • Cargill India Pvt Ltd
  • Medco Energi Mining Internasional
  • Central Java Power - Indonesia
  • Altura Mining Limited, Indonesia
  • Vitol - Bahrain
  • Goldman Sachs - Singapore
  • World Bank
  • Gujarat Mineral Development Corp Ltd - India
  • Toyota Tsusho Corporation, Japan
  • Bank of Tokyo Mitsubishi UFJ Ltd
  • Banpu Public Company Limited - Thailand
  • Indika Energy - Indonesia
  • U S Energy Resources
  • SMC Global Power, Philippines
  • CNBM International Corporation - China
  • J M Baxi & Co - India
  • The India Cements Ltd
  • Mercator Lines Limited - India
  • Vizag Seaport Private Limited - India
  • LBH Netherlands Bv - Netherlands
  • Ministry of Finance - Indonesia
  • Glencore India Pvt. Ltd
  • SN Aboitiz Power Inc, Philippines
  • Dalmia Cement Bharat India
  • Malabar Cements Ltd - India
  • Central Electricity Authority - India
  • Freeport Indonesia
  • Makarim & Taira - Indonesia
  • VISA Power Limited - India
  • SGS (Thailand) Limited
  • Tata Chemicals Ltd - India
  • MS Steel International - UAE
  • GAC Shipping (India) Pvt Ltd
  • BRS Brokers - Singapore
  • Posco Energy - South Korea
  • Metalloyd Limited - United Kingdom
  • Clarksons - UK
  • GVK Power & Infra Limited - India
  • McConnell Dowell - Australia
  • Borneo Indobara - Indonesia
  • Barasentosa Lestari - Indonesia
  • Coalindo Energy - Indonesia
  • Oldendorff Carriers - Singapore
  • Tamil Nadu electricity Board
  • Total Coal South Africa
  • International Coal Ventures Pvt Ltd - India
  • PetroVietnam Power Coal Import and Supply Company
  • Bahari Cakrawala Sebuku - Indonesia
  • Port Waratah Coal Services - Australia
  • Rashtriya Ispat Nigam Limited - India
  • Maybank - Singapore
  • Sarangani Energy Corporation, Philippines
  • Runge Indonesia
  • Thermax Limited - India
  • TANGEDCO India
  • Directorate Of Revenue Intelligence - India
  • Independent Power Producers Association of India
  • Platou - Singapore
  • DBS Bank - Singapore
  • NALCO India
  • Panama Canal Authority
  • Tata Power - India
  • Cement Manufacturers Association - India
  • Sical Logistics Limited - India
  • Ministry of Mines - Canada
  • Asia Pacific Energy Resources Ventures Inc, Philippines
  • Ernst & Young Pvt. Ltd.
  • Binh Thuan Hamico - Vietnam
  • Indian Energy Exchange, India
  • Aditya Birla Group - India
  • Commonwealth Bank - Australia
  • Merrill Lynch Commodities Europe
  • TRAFIGURA, South Korea
  • Cosco
  • Berau Coal - Indonesia
  • Meralco Power Generation, Philippines
  • Cardiff University - UK
  • Shree Cement - India
  • Indorama - Singapore
  • Semirara Mining and Power Corporation, Philippines
  • Ministry of Transport, Egypt
  • Krishnapatnam Port Company Ltd. - India
  • Kapuas Tunggal Persada - Indonesia
  • Indonesia Power. PT
  • ING Bank NV - Singapore
  • Neyveli Lignite Corporation Ltd, - India
  • Pinang Coal Indonesia
  • Bank of America
  • PLN - Indonesia
  • Mechel - Russia
  • Electricity Authority, New Zealand
  • Infraline Energy - India
  • Asia Cement - Taiwan
  • Karbindo Abesyapradhi - Indoneisa
  • Bulk Trading Sa - Switzerland
  • JPower - Japan
  • Pipit Mutiara Jaya. PT, Indonesia
  • ASAPP Information Group - India
  • KPCL - India
  • Idemitsu - Japan
  • IBC Asia (S) Pte Ltd
  • Coal and Oil Company - UAE
  • Georgia Ports Authority, United States
  • Sree Jayajothi Cements Limited - India
  • Electricity Generating Authority of Thailand
  • Siam City Cement - Thailand
  • Mitra SK Pvt Ltd - India
  • GNFC Limited - India
  • CoalTek, United States
  • Petrosea - Indonesia
  • Kalimantan Lumbung Energi - Indonesia
  • Ind-Barath Power Infra Limited - India
  • Xstrata Coal
  • Cemex - Philippines
  • Qatrana Cement - Jordan
  • Truba Alam Manunggal Engineering.Tbk - Indonesia
  • Salva Resources Pvt Ltd - India
  • Xindia Steels Limited - India
  • Japan Coal Energy Center
  • Simpson Spence & Young - Indonesia
  • Lafarge - France
  • Intertek Mineral Services - Indonesia
  • The State Trading Corporation of India Ltd
  • ICICI Bank Limited - India
  • KOWEPO - South Korea
  • Jorong Barutama Greston.PT - Indonesia
  • Baramulti Group, Indonesia
  • Maruti Cements - India
  • IMC Shipping - Singapore
  • Jaiprakash Power Ventures ltd
  • SUEK AG - Indonesia
  • Heidelberg Cement - Germany
  • Planning Commission, India
  • OPG Power Generation Pvt Ltd - India
  • Energy Link Ltd, New Zealand
  • Bank of China, Malaysia
  • Kepco SPC Power Corporation, Philippines
  • Larsen & Toubro Limited - India
  • Arutmin Indonesia
  • Kobexindo Tractors - Indoneisa
  • Vale Mozambique
  • Rio Tinto Coal - Australia
  • Offshore Bulk Terminal Pte Ltd, Singapore
  • HSBC - Hong Kong
  • Billiton Holdings Pty Ltd - Australia
  • Lanco Infratech Ltd - India
  • Star Paper Mills Limited - India
  • KEPCO - South Korea
  • Argus Media - Singapore
  • World Coal - UK
  • IEA Clean Coal Centre - UK
  • Meenaskhi Energy Private Limited - India
  • Siam City Cement PLC, Thailand
  • EMO - The Netherlands
  • Ceylon Electricity Board - Sri Lanka
  • Sojitz Corporation - Japan
  • Mjunction Services Limited - India
  • CESC Limited - India
  • EIA - United States
  • Savvy Resources Ltd - HongKong
  • Kideco Jaya Agung - Indonesia
  • Bukit Makmur.PT - Indonesia
  • Thailand Anthracite
  • Sakthi Sugars Limited - India
  • Bhatia International Limited - India
  • Indogreen Group - Indonesia
  • Thiess Contractors Indonesia
  • Maharashtra Electricity Regulatory Commission - India
  • Jatenergy - Australia
  • Indo Tambangraya Megah - Indonesia
  • Asmin Koalindo Tuhup - Indonesia
  • Arch Coal - USA
  • Straits Asia Resources Limited - Singapore
  • Directorate General of MIneral and Coal - Indonesia
  • ANZ Bank - Australia
  • South Luzon Thermal Energy Corporation
  • Sucofindo - Indonesia
  • Mitsui
  • New Zealand Coal & Carbon
  • Dong Bac Coal Mineral Investment Coporation - Vietnam
  • Coeclerici Indonesia
  • UBS Singapore
  • WorleyParsons
  • Malco - India
  • Latin American Coal - Colombia
  • SASOL - South Africa
  • PNOC Exploration Corporation - Philippines
  • Leighton Contractors Pty Ltd - Australia
  • Bukit Asam (Persero) Tbk - Indonesia
  • Chamber of Mines of South Africa
  • Barclays Capital - USA
  • Inco-Indonesia
  • Pendopo Energi Batubara - Indonesia
  • Kumho Petrochemical, South Korea
  • Price Waterhouse Coopers - Russia
  • Antam Resourcindo - Indonesia
  • Attock Cement Pakistan Limited
  • Grasim Industreis Ltd - India
  • Chettinad Cement Corporation Ltd - India
  • TNPL - India
  • Aboitiz Power Corporation - Philippines
  • ACC Limited - India
  • Credit Suisse - India
  • Maheswari Brothers Coal Limited - India
  • bp singapore
  • Eastern Energy - Thailand
  • Miang Besar Coal Terminal - Indonesia
  • Petrochimia International Co. Ltd.- Taiwan
  • San Jose City I Power Corp, Philippines
  • Kartika Selabumi Mining - Indonesia
  • Global Business Power Corporation, Philippines
  • Vijayanagar Sugar Pvt Ltd - India
  • Filglen & Citicon Mining (HK) Ltd - Hong Kong
  • PetroVietnam
  • PLN Batubara - Indonesia
  • RBS Sempra - UK
  • Sindya Power Generating Company Private Ltd
  • GB Group - China
  • Noble Europe Ltd - UK
  • Mercuria Energy - Indonesia
  • Riau Bara Harum - Indonesia
  • Alfred C Toepfer International GmbH - Germany
  • Essar Steel Hazira Ltd - India
  • Rudhra Energy - India
  • Timah Investasi Mineral - Indoneisa
  • Semirara Mining Corp, Philippines
  • Surastha Cement
  • Wilmar Investment Holdings
  • CIMB Investment Bank - Malaysia
  • Samtan Co., Ltd - South Korea
  • Romanian Commodities Exchange